567.115.1 Scope and applicability. |
|
|
|
567.115.2 Permit required. |
|
|
|
567.115.3 Types of permits. |
|
|
|
567.115.4 Applications for permits. |
|
|
|
567.115.5 Preparation of plans. |
|
|
|
567.115.6 Construction and operation. |
|
|
|
567.115.7 Compliance with rule changes. |
|
|
|
567.115.8 Amendments. |
|
|
|
567.115.9 Transfer of title and permit. |
|
|
|
567.115.10 Permit conditions. |
|
|
|
567.115.11 Effect of revocation. |
|
|
|
567.115.12 Inspection prior to start-up. |
|
|
|
567.115.13 Primary plan requirements for all sanitary disposal projects. |
|
|
|
567.115.14 Hydrologic monitoring system planning requirements. |
|
|
|
567.115.15 Soil investigation. |
|
|
|
567.115.16 Hydrogeologic investigation. |
|
|
|
567.115.17 Hydrologic monitoring system planning report requirements. |
|
|
|
567.115.18 Evaluation of hydrogeologic conditions. |
|
|
|
567.115.19 Monitoring system plan. |
|
|
|
567.115.20 Sampling protocol. |
|
|
|
567.115.21 Monitoring well maintenance and performance reevaluation plan. |
|
|
|
567.115.22 Monitoring well siting requirements. |
|
|
|
567.115.23 Monitoring well/soil boring construction standards. |
|
|
|
567.115.24 Sealing abandoned wells and boreholes. |
|
|
|
567.115.25 Variance from design, construction, and operation standards. |
|
|
|
567.115.26 General requirements for all sanitary landfills. |
|
|
|
567.115.27 Operating requirements for all sanitary disposal projects. |
|
|
|
567.115.28 Specific requirements for a sanitary landfill proposing to accept a specific type of solid waste. |
|
|
|
567.115.29 Operator certification. |
|
|
|
567.115.30 Emergency response and remedial action plans. |
|
|
|
567.115.31 Industrial monofill sanitary landfill financial assurance. |
|
|
|