Previous Day: Monday, April 7 | Next Day: |
Senate Journal: Index | House Journal: Index |
Legislation: Index | Bill History: Index |
Previous Page: 1073 | Today's Journal Page |
This file contains STRIKE and UNDERSCORE. If you cannot see either STRIKE or UNDERSCORE attributes or would like to change how these attributes are displayed, please use the following form to make the desired changes.
Page 3 1collected in indemnity fees in the manure storage2indemnity fund created in section 204.2.3 d. The department shall issue a permit for an 4 animal feeding operation, if an application is 5 submitted according to procedures required by the 6 department, and the application meets standards 7 established by the department, regardless of whether 8 the animal feeding operation is required to obtain 9 such a permit. An applicant for a construction permit 10 shall not begin construction at the location of a site 11 planned for the construction of an animal feeding 12 operation structure, until the person has been granted 13 a permit for the construction of the structure by the 14 department. The department shall make a determination 15 regarding the approval or denial of a permit within 16 sixty days from the date that the department receives 17 a completed application for a permit. However, the 18 sixty-day requirement shall not apply to an 19 application, if the applicant is not required to 20 obtain a permit in order to construct an animal 21 feeding operation structure or to operate an animal 22 feeding operation. The department shall deliver a 23 copy or require the applicant to deliver a copy of the 24 application for a construction permit to the county 25 board of supervisors in the county where the 26 confinement feeding operation or confinement feeding 27 operation structure subject to the permit is to be 28 located. The department shall not approve the 29 application or issue a construction permit until 30 thirty days following delivery of the application to 31 the county board of supervisors. The department shall 32 consider comments from the county board of 33 supervisors, regarding compliance by the applicant 34 with the legal requirements for the construction of 35 the confinement feeding operation structure as 36 provided in this chapter, and rules adopted by the 37 department pursuant to this chapter, if the comments 38 are delivered to the department within fourteen days 39 after receipt of the application by the county board 40 of supervisors. Prior to granting a permit to a 41 person for the construction of an animal feeding 42 operation, the department may require the installation 43 and operation of a hydrological monitoring system for 44 an exclusively earthen manure storage structure, if, 45 after an on-site inspection, the department determines 46 that the site presents an extraordinary potential for 47 groundwater pollution. 48 e. A person shall not obtain a permit for the 49 construction of a confinement feeding operation, 50 unless the person develops a manure management plan as
Next Page: 1075 | |
Previous Day: Monday, April 7 | Next Day: |
Senate Journal: Index | House Journal: Index |
Legislation: Index | Bill History: Index |
© 1997 Cornell College and League of Women Voters of Iowa
Comments about this site or page? hjourn@legis.iowa.gov. Please remember that the person listed above does not vote on bills. Direct all comments concerning legislation to State Legislators.
Last update: Thu Apr 10 13:40:03 CDT 1997
URL: /DOCS/GA/77GA/Session.1/HJournal/01000/01074.html
jhf