Text: HF02326 Text: HF02328 Text: HF02300 - HF02399 Text: HF Index Bills and Amendments: General Index Bill History: General Index
PAG LIN 1 1 Section 1. NEW SECTION. 331.411 CONFINEMENT FEEDING 1 2 OPERATIONS. 1 3 1. As used in this section: 1 4 a. "Confinement swine feeding operation" means an animal 1 5 feeding operation in which swine are confined to areas which 1 6 are totally roofed. 1 7 b. "Construction permit" means a permit issued by the 1 8 department for the construction of a structure, device, or 1 9 practice. 1 10 c. "Consulting engineer" means a professional engineer 1 11 serving the county as an employee or pursuant to a contract. 1 12 d. "Department" means the department of natural resources. 1 13 e. "Professional engineer" means an engineer registered 1 14 pursuant to chapter 542B. 1 15 f. "Structure, device, or practice" means an animal 1 16 feeding operation structure, including an anaerobic lagoon, 1 17 earthen manure storage basin, formed manure storage structure, 1 18 or any related pollution control device or practice, which is 1 19 part of a confinement swine feeding operation regulated by the 1 20 department of natural resources. 1 21 2. A person shall not receive a construction permit from 1 22 the department, unless the application is recommended for 1 23 approval by the county engineer or a consulting engineer 1 24 serving the county in which the structure, device, or practice 1 25 is to be located. The county may waive any right to receive 1 26 an application for further comment prior to approval by the 1 27 department. 1 28 Within fourteen calendar days after receipt of the 1 29 application by the county, the county engineer or the 1 30 consulting engineer shall either recommend the approval or 1 31 disapproval of the application and forward the application to 1 32 the department as required by the department. An application 1 33 which is not received by the department in a timely manner 1 34 shall be deemed to be recommended for approval by the county 1 35 engineer or consulting engineer. 2 1 3. The application shall include preliminary drawings and 2 2 specifications required by the county engineer or consulting 2 3 engineer. The application must be certified by the 2 4 applicant's professional engineer. The county engineer or 2 5 consulting engineer shall conduct a technical review of the 2 6 application to ensure that the construction does not violate 2 7 state law, including rules adopted by the department of 2 8 natural resources, and addresses criteria required by the 2 9 county engineer or consulting engineer, including the 2 10 environmental sensitivity of the site, the area's soil 2 11 condition, the proximity of the structure or practice to 2 12 surface water, the level of the area's water table, the 2 13 potential for flooding, and drainage. 2 14 4. If the department approves the application, the permit 2 15 shall be conditioned upon inspection of the construction by 2 16 the county engineer or consulting engineer during each phase 2 17 of construction. Any changes in the construction shall be 2 18 approved by the county engineer or consulting engineer, and 2 19 noted on final as-built drawings and specifications which 2 20 shall be filed by the county. A copy of the approved final 2 21 as-built drawings and specifications shall be forwarded to the 2 22 department for filing. 2 23 5. The department shall annually reimburse each county for 2 24 an amount expended by the county in recommending the approval 2 25 or disapproval of a construction permit prior to departmental 2 26 approval. The reimbursement shall be made according to rules 2 27 adopted by the department. An applicant shall reimburse the 2 28 county for the amount expended by the county in inspecting 2 29 each phase of construction, and approving final as-built 2 30 drawings and specifications for the construction. 2 31 EXPLANATION 2 32 This bill provides for the issuance of construction permits 2 33 for an animal feeding operation structure, including an 2 34 anaerobic lagoon, earthen manure storage basin, formed manure 2 35 storage structure, or any related pollution control device or 3 1 practice, which is part of a confinement swine feeding 3 2 operation regulated by the department of natural resources. 3 3 The bill prohibits a person from receiving a construction 3 4 permit, unless the county engineer or a professional engineer 3 5 serving the county recommends the approval of the permit to 3 6 the department. The bill provides that the application must 3 7 include preliminary drawings and specifications. In addition, 3 8 the bill requires the application be certified by the 3 9 applicant's professional engineer. The application is 3 10 required to ensure that the construction does not violate 3 11 state law, including rules adopted by the department of 3 12 natural resources, and addresses criteria required by the 3 13 county engineer or other professional engineer serving the 3 14 county. The bill provides that once the department approves 3 15 the application, the permit is conditioned upon inspection of 3 16 the construction by the professional engineer serving the 3 17 county during each phase of construction. The bill requires 3 18 the department to annually reimburse each county for an amount 3 19 expended by the county in approving or disapproving a permit 3 20 prior to departmental approval. The bill requires an 3 21 applicant to reimburse the county for the amount expended by 3 22 the county in inspecting each phase of construction, and 3 23 approving final as-built drawings and specifications for the 3 24 construction. 3 25 LSB 4083YH 76 3 26 da/cf/24.2
Text: HF02326 Text: HF02328 Text: HF02300 - HF02399 Text: HF Index Bills and Amendments: General Index Bill History: General Index
© 1996 Cornell College and League of Women Voters of Iowa
Comments? webmaster@legis.iowa.gov.
Last update: Tue Mar 5 03:20:29 CST 1996
URL: /DOCS/GA/76GA/Legislation/HF/02300/HF02327/960226.html
jhf