| Previous Day: Tuesday, March 23 | Next Day: |
| Senate Journal: Index | House Journal: Index |
| Legislation: Index | Bill History: Index |
| Previous Page: 834 | Today's Journal Page |
42 longer under the authority of the contract producer 43 when the crop or a warehouse receipt issued by a 44 warehouse operator licensed under chapter 203C for 45 grain from the crop is no longer under the custody or 46 control of the contract producer. 47 2. In order to preserve the lien, the contract 48 producer must file in the office of the secretary of 49 state a lien statement on a form prescribed by the 50 secretary of state. If the lien arises out of Page 7 1 producing livestock or milk, the contract producer 2 must file the lien within twenty days after the 3 livestock arrive at the contract livestock facility. 4 If the lien arises out of producing a crop, the 5 contract producer must file the lien within twenty 6 days after the crop is planted. The secretary of 7 state shall charge a fee of not more than ten dollars 8 for filing the statement. The secretary of state may 9 adopt rules pursuant to chapter 17A for the electronic 10 filing of the statements. The statement must include 11 all of the following: 12 a. An estimate of the amount owed pursuant to the 13 production contract. 14 b. The date when the livestock arrive at the 15 contract livestock facility or the date when the crop 16 was planted. 17 c. The estimated duration of the period when the 18 commodity will be under the authority of the contract 19 producer. 20 d. The name of the party to the production 21 contract whose commodity is produced pursuant to the 22 production contract. 23 e. The description of the location of the contract 24 operation, by county and township. 25 f. The printed name and signature of the person 26 filing the form. 27 4. Except as provided in chapter 581, a lien 28 created under this section until preserved and a lien 29 preserved under this section is superior to and shall 30 have priority over a conflicting lien or security 31 interest in the commodity, including a lien or 32 security interest that was perfected prior to the 33 creation of the lien provided under this section. 34 Sec. 15. NEW SECTION. 579B.3 ENFORCEMENT. 35 Before a commodity leaves the authority of the 36 contract producer as provided in section 579B.2, the 37 contract producer may foreclose a lien created in that 38 section in the manner provided for the foreclosure of 39 secured transactions as provided in sections 554.9504, 40 554.9506, and 554.9507. After the commodity is no
| Next Page: 836 | |
| Previous Day: Tuesday, March 23 | Next Day: |
| Senate Journal: Index | House Journal: Index |
| Legislation: Index | Bill History: Index |
© 1999 Cornell College and League of Women Voters of Iowa
Comments about this site or page?
hjourn@legis.iowa.gov.
Please remember that the person listed above does not vote on bills. Direct all comments concerning legislation to State Legislators.
Last update: Thu Mar 25 13:30:03 CST 1999
URL: /DOCS/GA/78GA/Session.1/HJournal/00800/00835.html
jhf