| Previous Day: Thursday, April 9 | Next Day: |
| Senate Journal: Index | House Journal: Index |
| Legislation: Index | Bill History: Index |
| Previous Page: 1517 | Today's Journal Page |
This file contains STRIKE and UNDERSCORE. If you cannot see either STRIKE or UNDERSCORE attributes or would like to change how these attributes are displayed, please use the following form to make the desired changes.
39 (2) The board may hold a public hearing to receive 40 public comments regarding the application for the 41 construction permit. The county board of supervisors 42 may submit comments by the board and the public to the 43 department as provided in this section, including but 44 not limited to all of the following: 45 (a) The existence of an object or location not 46 included in the construction permit application which 47 benefits from a separation distance requirement as 48 provided in section 455B.162 or 455B.204. 49 (b) The suitability of soils and the hydrology of 50 the site where construction or expansion of a Page 22 1 confinement feeding operation or related animal 2 feeding operation structure is proposed. 3 (c) The availability of land for the application 4 of manure originating from the confinement feeding 5 operation. 6 (d) Whether the construction or expansion of a 7 proposed animal feeding operation structure will 8 impede drainage through established tile lines, 9 laterals, or other improvements which are constructed 10 to facilitate the drainage of land not owned by the 11 person applying for the construction permit. 12 b. The department shall notify the county board of 13 supervisors at least three days prior to conducting an 14 inspection of the site that the construction is 15 proposed in the permit application. The county board 16 of supervisors may designate a county employee to 17 accompany a departmental official during the site 18 inspection. The county designee shall have the same 19 right to access to the site's real estate as the 20 departmental official conducting the inspection during 21 the period that the county designee accompanies the 22 departmental official. 23 c. The department shall not approve the 24 application until thirty days following delivery of 25 the application to the county board of supervisors. 26 d. The department shall consider and respond to 27 comments submitted by the county board of supervisors 28 regarding compliance by the applicant with the legal 29 requirements for approving the construction permit as 30 provided in this chapter, including rules adopted by 31 the department pursuant to section 455B.200, if the 32 comments are delivered to the department within thirty 33 days after receipt of the application by the county 34 board of supervisors. Upon written request by a 35 county resident, the county board of supervisors shall 36 forward a copy of the board's comments and the 37 department's responses to the county resident as 38 provided in chapter 22.
| Next Page: 1519 | |
| Previous Day: Thursday, April 9 | Next Day: |
| Senate Journal: Index | House Journal: Index |
| Legislation: Index | Bill History: Index |
© 1998 Cornell College and League of Women Voters of Iowa
Comments about this site or page?
hjourn@legis.iowa.gov.
Please remember that the person listed above does not vote on bills. Direct all comments concerning legislation to State Legislators.
Last update: Tue Apr 14 13:40:03 CDT 1998
URL: /DOCS/GA/77GA/Session.2/HJournal/01500/01518.html
jhf