![]()
| Previous Day: Tuesday, April 16 | Next Day: |
| Senate Journal: Index | House Journal: Index |
| Legislation: Index | Bill History: Index |
| Previous Page: 1711 | Today's Journal Page |
This file contains STRIKE and UNDERSCORE. If you cannot see either STRIKE or UNDERSCORE attributes or would like to change how these attributes are displayed, please use the following form to make the desired changes.
45 4. Notwithstanding subsection 2, alternate energy 46 produced by recovery of methane at a sanitary landfill 47 shall be purchased at the rate existing as of January 48 1, 1996. 49 Sec. 21. Section 476.44, subsection 1, Code 1995, 50 is amended by striking the subsection. Page 8 1 Sec. 22. Section 476.44, subsection 2, Code 1995, 2 is amended to read as follows: 3 2. a. An electric utility subject to this 4 division, except a utility which elects rate 5 regulation pursuant to section 476.1A, shallnotbe 6 required to purchase, at any one time, more thanits 7 share ofonetwo hundredfiveten megawatts of power 8 from alternative energy production facilities or small 9 hydro facilitiesat the ratesin accordance with the 10 competitive bidding process established pursuant to 11 section 476.43 and pursuant to timelines established 12 under paragraph "c". For purposes of this section, 13 "megawatt" shall be determined in accordance with a 14 utility's average capacity. "Average capacity" means 15 a utility's total output over a year divided by the 16 number of hours in the year. The board shall allocate 17 theonetwo hundredfiveten megawatts based upon each 18 utility's percentage of the total Iowa retail peak 19 demand, for the year beginning January 1, 1990, of all 20 utilities subject to this section. If a utility 21 undergoes reorganization as defined in section 476.76, 22 the board shall combine the allocated purchases of 23 power for each utility involved in the reorganization. 24 Notwithstanding theonetwo hundredfiveten 25 megawatt maximum, the board may increase the amount of 26 power that a utility is required to purchaseat the27rates established pursuant to section 476.43if the 28 board finds that a utility, including a reorganized 29 utility, exceeds its 1990 Iowa retail peak demand by 30 twenty percent and the additional power the utility is 31 required to purchase will encourage the development of 32 alternate energy production facilities and small hydro 33 facilities. The increase shall not exceed the 34 utility's increase in peak demand multiplied by the 35 ratio of the utility's share of theonetwo hundred 36fiveten megawatt maximum to its 1990 Iowa retail peak 37 demand. 38 b. Of that portion of alternate energy required to 39 be purchased by a utility under this section, eighty- 40 five percent shall be purchased from alternate energy 41 production facilities or small hydro facilities 42 generating electricity with current and viable 43 technologies and fifteen percent shall be purchased 44 from alternate energy production facilities generating
| Next Page: 1713 | |
| Previous Day: Tuesday, April 16 | Next Day: |
| Senate Journal: Index | House Journal: Index |
| Legislation: Index | Bill History: Index |
© 1996 Cornell College and League of Women Voters of Iowa
Comments? hjourn@legis.iowa.gov.
Last update: Thu Apr 18 13:30:03 CDT 1996
URL: /DOCS/GA/76GA/Session.2/HJournal/01700/01712.html
jhf