Previous Day: Thursday, April 27 | Next Day: Monday, May 1 |
Senate Journal: Index | House Journal: Index |
Legislation: Index | Bill History: Index |
Previous Page: 2101 | Today's Journal Page |
This file contains STRIKE and UNDERSCORE. If you cannot see either STRIKE or UNDERSCORE attributes or would like to change how these attributes are displayed, please use the following form to make the desired changes.
19 following: 20 "7A. The board may provide for exemption from the 21 certification requirements of this section for a 22 professional engineer registered pursuant to chapter 23 542B, if the person is qualified in the field of 24 geotechnical, hydrological, environmental groundwater, 25 or hydrogeological engineering." 26 10. Page 13, line 23, by striking the word 27 "moneys". 28 11. Page 13, line 24, by striking the words 29 "Seventeen million dollars per year" and inserting the 30 following: "Moneys allocated to the fund". 31 12. Page 13, line 34, by inserting after the word 32 "board." the following: "The innocent landowners fund 33 shall also include any moneys recovered pursuant to 34 cost recovery enforcement under section 455G.13." 35 13. Page 14, line 16, by striking the words 36 "Twelve million dollars per year" and inserting the 37 following: "The remainder of the moneys". 38 14. Page 14, by striking lines 22 and 23 and 39 inserting the following: "subparagraph (2) is 40 repealed on January 1, 2003." 41 15. Page 15, line 20, by inserting after the word 42 "report" the following: "jointly with the department 43 of natural resources". 44 16. Page 15, by striking line 25 and inserting 45 the following: "when final rules referred to in 46 subparagraph (2) are adopted by the environmental 47 protection commission." 48 17. Page 16, line 2, by striking the word "Take" 49 and inserting the following: "Shall take". 50 18. Page 16, by striking lines 10 through 12 and Page 3 1 inserting the following: 2 "3. During the period of time from the enactment 3 of this Act until such time as the rules implementing 4 the amendments to section 455B.474, contained in this 5 Act, become effective, the department of natural 6 resources may require an owner or operator to proceed 7 with corrective action only if the action is necessary 8 to protect public health and safety or the 9 environment. An owner or operator may elect to 10 proceed with corrective action pursuant to rules of 11 the department existing on January 1, 1995, until such 12 time as the rules implementing the amendments to 13 section 455B.474, contained in this Act, become 14 effective. However, the board may refuse to pay 15 corrective action costs on a site during the interim 16 period if it is likely that the site would be 17 reclassified as a lower risk site when the rules 18 implementing risk-based corrective action standards 19 become effective."
Next Page: 2103 | |
Previous Day: Thursday, April 27 | Next Day: Monday, May 1 |
Senate Journal: Index | House Journal: Index |
Legislation: Index | Bill History: Index |
© 1995 Cornell College and League of Women Voters of Iowa
Comments? hjourn@legis.iowa.gov.
Last update: Sun Jan 14 21:05:02 CST 1996
URL: /DOCS/GA/76GA/Session.1/HJournal/02100/02102.html
jhf