41 6. This section does not require an electric 42 utility to construct additional facilities unless 43 those facilities are paid for by the owner or operator 44 of theaffected alternate energy production facility45or small hydro facilitymethane-producing sanitary 46 landfill. 47 7. For purposes of this section, "methane- 48 producing sanitary landfill" means any electric 49 generating facility fueled by methane extracted from a 50 sanitary landfill. Page 3 1 Sec. ___. NEW SECTION. 476.43A RATES FOR 2 ALTERNATE ENERGY PRODUCTION FACILITIES OR SMALL HYDRO 3 FACILITIES. 4 1. The board shall require electric utilities to 5 enter into long-term contracts to purchase electric 6 energy from alternate energy production facilities or 7 small hydro facilities. 8 2. The rates for purchases under this section 9 shall not exceed the incremental costs to the electric 10 utility of alternative electric energy. For purposes 11 of this section "incremental cost" means the cost to 12 the electric utility of the electric energy which, but 13 for the purchase from the alternate energy production 14 facility or small hydro facility, the electric utility 15 would have generated or purchased from another source. 16 3. In the case of a utility that purchases all or 17 substantially all of its electricity requirements, the 18 rates established under this section must be based on 19 the electric utility's current purchased power costs. 20 4. In lieu of the other procedures provided by 21 this section, an electric utility and an owner or 22 operator of an alternate energy production facility or 23 small hydro facility may enter into a long-term 24 contract in accordance with subsection 1 and may agree 25 to rates for purchase and sale transactions. A 26 contract entered into under this subsection must be 27 filed with the board in the manner provided for 28 tariffs under section 476.4. 29 5. This section does not require an electric 30 utility to construct additional facilities unless 31 those facilities are paid for by the owner or operator 32 of the affected alternate energy production facility 33 or small hydro facility." 34 5. Page 1, by striking lines 31 and 32 and 35 inserting the following: 36 "Sec. ___. Notwithstanding the provisions of this 37 Act, the Iowa". 38 6. By renumbering as necessary. McCoy of Polk offered the following amendment H-3717, to amendment H-3710, filed by him from the floor and moved its adoption:
| Next Page: 1216 | |
| Previous Day: Monday, April 3 | Next Day: Wednesday, April 5 |
| Senate Journal: Index | House Journal: Index |
| Legislation: Index | Bill History: Index |
© 1995 Cornell College and League of Women Voters of Iowa
Comments? hjourn@legis.iowa.gov.
Last update: Sun Jan 14 21:05:02 CST 1996
URL: /DOCS/GA/76GA/Session.1/HJournal/01200/01215.html
jhf