Previous Day: Monday, April 3 | Next Day: Wednesday, April 5 |
Senate Journal: Index | House Journal: Index |
Legislation: Index | Bill History: Index |
Previous Page: 1212 | Today's Journal Page |
This file contains STRIKE and UNDERSCORE. If you cannot see either STRIKE or UNDERSCORE attributes or would like to change how these attributes are displayed, please use the following form to make the desired changes.
The following amendments were deferred by unanimous consent: H-3678 filed by Shoultz of Black Hawk. H-3679 filed by Shoultz of Black Hawk. H-3705 filed by Shoultz of Black Hawk. H-3699 filed by Weigel of Chickasaw. Weigel of Chickasaw asked and received unanimous consent to withdraw amendment H-3700 filed by him on April 3, 1995. McCoy of Polk offered amendment H-3710 filed by him as follows: H-3710 1 Amend House File 370 as follows: 2 1. Page 1, line 4, by inserting after the figure 3 "476.43," the following: "476.43A,". 4 2. Page 1, line 11, by inserting after the figure 5 "476.43," the following: "476.43A,". 6 3. Page 1, by inserting after line 11 the 7 following: 8 "Sec. ___. Section 476.42, subsection 1, Code 9 1995, is amended by adding the following new 10 unnumbered paragraph: 11 NEW UNNUMBERED PARAGRAPH. An alternate energy 12 production facility does not include a methane- 13 producing sanitary landfill." 14 4. Page 1, by striking lines 14 through 28 and 15 inserting the following: 16 "Sec. ___. Section 476.43, Code 1995, is amended 17 to read as follows: 18 476.43 RATES FORALTERNATE ENERGY PRODUCTION19FACILITIESMETHANE-PRODUCING SANITARY LANDFILLS. 20 1.Subject to section 476.44, theThe board shall 21 require electric utilities to enter into long-term 22 contracts to do the following: 23 a. Purchase or wheel electricity fromalternate24energy production facilities or small hydro facilities25 methane-producing sanitary landfills located in the 26 utility's service area under the terms and conditions 27 that the board finds are just and economically 28 reasonable to the electric utilities' ratepayers,and 29 are nondiscriminatory toalternate energy producers30and small hydro producers and will further the policy31stated in section 476.41methane-producing sanitary 32 landfills. 33 b. Provide for the availability of supplemental or 34 backup power toalternate energy production facilities35or small hydro facilitiesmethane-producing sanitary 36 landfills on a nondiscriminatory basis and at just and 37 reasonable rates. 38 2. Upon application by the owner or operator ofan39alternate energy production facility or small hydro
Next Page: 1214 | |
Previous Day: Monday, April 3 | Next Day: Wednesday, April 5 |
Senate Journal: Index | House Journal: Index |
Legislation: Index | Bill History: Index |
© 1995 Cornell College and League of Women Voters of Iowa
Comments? hjourn@legis.iowa.gov.
Last update: Sun Jan 14 21:05:02 CST 1996
URL: /DOCS/GA/76GA/Session.1/HJournal/01200/01213.html
jhf