Previous Day: Friday, February 24 | Next Day: Tuesday, February 28 |
Senate Journal: Index | House Journal: Index |
Legislation: Index | Bill History: Index |
Previous Page: 599 | Today's Journal Page |
This file contains STRIKE, UNDERSCORE, and BOLD. If you cannot see either STRIKE or UNDERSCORE attributes or would like to change how these attributes are displayed, please use the following form to make the desired changes.
Hammitt Hanson Harrison Heaton Houser Hurley Huseman Jacobs Klemme Kremer Lamberti Larson Lord Main Martin McCoy Mertz Metcalf Meyer Millage Moreland Mundie Nelson, B. Nutt Rants Renken Salton Schulte Siegrist Sukup Teig Thomson Tyrrell Van Fossen Vande Hoef Veenstra Warnstadt Weidman Welter Witt Van Maanen, Presiding Absent or not voting, 3: Brammer Ertl Greiner Amendment H-3208 lost. Rule 76, invoked. Under the provisions of Rule 76, conflict of interest, Ertl of Dubuque refrained from voting. Rants of Woodbury offered the following amendment H-3121, to the committee amendment H-3030, filed by Rants, et. al., and moved its adoption: H-3121 1 Amend the amendment, H-3030, to Senate File 69, as 2 passed by the Senate, as follows: 3 1. Page 8, by inserting after line 16 the follow- 4 ing: 5 "Any electric power generating plant which operated 6 during the preceding assessment year at a net capacity 7 factor of more than twenty percent, shall not receive 8 the benefits of this section. For purposes of this 9 section, "electric power generating plant" means any 10 name plate rated electric power generating plant, in 11 which electric energy is produced from other forms of 12 energy, including all taxable land, buildings, and 13 equipment used in the production of such energy. "Net 14 capacity factor" means net actual generation divided 15 by the product of net maximum capacity times the 16 number of hours the unit was in the active state 17 during the assessment year. Upon commissioning, a 18 unit is in the active state until it is de- 19 commissioned. "Net actual generation" means net 20 electrical megawatt hours produced by the unit during 21 the preceding assessment year. "Net maximum capacity" 22 means the capacity the unit can sustain over a 23 specified period when not restricted by ambient 24 conditions or equipment deratings, minus the losses 25 associated with station service or auxiliary loads."
Next Page: 601 | |
Previous Day: Friday, February 24 | Next Day: Tuesday, February 28 |
Senate Journal: Index | House Journal: Index |
Legislation: Index | Bill History: Index |
© 1995 Cornell College and League of Women Voters of Iowa
Comments? hjourn@legis.iowa.gov.
Last update: Sun Jan 14 21:05:02 CST 1996
URL: /DOCS/GA/76GA/Session.1/HJournal/00600/00600.html
jhf