House Journal: Page 600: Monday, February 27, 1995

Hammitt        	Hanson         	Harrison       	Heaton        
	Houser         	Hurley         	Huseman        	Jacobs        
	Klemme         	Kremer         	Lamberti       	Larson        
	Lord           	Main           	Martin         	McCoy         
	Mertz          	Metcalf        	Meyer          	Millage       
	Moreland       	Mundie         	Nelson,  B.      	Nutt         
 	Rants          	Renken         	Salton         	Schulte       
	Siegrist       	Sukup          	Teig           	Thomson       
	Tyrrell        	Van Fossen     	Vande Hoef     	Veenstra      
	Warnstadt      	Weidman        	Welter         	Witt          
	Van Maanen,				  Presiding
Absent or not voting, 3:
Brammer        	Ertl           	Greiner        	
Amendment H-3208 lost.
Rule 76, invoked. Under the provisions of Rule 76, conflict of
interest, Ertl of Dubuque refrained from voting.
Rants of Woodbury offered the following amendment H-3121, to the
committee amendment H-3030, filed by Rants, et. al., and moved
its adoption:
H-3121
 1     Amend the amendment, H-3030, to Senate File 69, as
 2   passed by the Senate, as follows:
 3     1.  Page 8, by inserting after line 16 the follow-
 4   ing:
 5     "Any electric power generating plant which operated
 6   during the preceding assessment year at a net capacity
 7   factor of more than twenty percent, shall not receive
 8   the benefits of this section.  For purposes of this
 9   section, "electric power generating plant" means any
10   name plate rated electric power generating plant, in
11   which electric energy is produced from other forms of
12   energy, including all taxable land, buildings, and
13   equipment used in the production of such energy.  "Net
14   capacity factor" means net actual generation divided
15   by the product of net maximum capacity times the
16   number of hours the unit was in the active state
17   during the assessment year.  Upon commissioning, a
18   unit is in the active state until it is de-
19   commissioned.  "Net actual generation" means net
20   electrical megawatt hours produced by the unit during
21   the preceding assessment year.  "Net maximum capacity"
22   means the capacity the unit can sustain over a
23   specified period when not restricted by ambient
24   conditions or equipment deratings, minus the losses
25   associated with station service or auxiliary loads."

Next Page: 601

Previous Day: Friday, February 24Next Day: Tuesday, February 28
Senate Journal: Index House Journal: Index
Legislation: Index Bill History: Index

Return To Home Iowa General Assembly

index Index: House Journal (76th General Assembly: Session 1)

© 1995 Cornell College and League of Women Voters of Iowa


Comments? hjourn@legis.iowa.gov.

Last update: Sun Jan 14 21:05:02 CST 1996
URL: /DOCS/GA/76GA/Session.1/HJournal/00600/00600.html
jhf