| Pg 1, Ln 3 | Division I appropriates funds from the RIIF. |
| Pg 1, Ln 8 |
Rebuild Iowa Infrastructure Fund appropriation to the DAS for major
maintenance, major repairs, and improvements to State facilities
throughout the State that are under the management of the Department.
DETAIL: The level of the funding has varied over the years. The DAS received $3,000,000 for major maintenance from the Revenue Bonds Capitals Fund (RBC) for FY 2011; $195,484 for major maintenance from the Restricted Capital Fund (RCF) for FY 2010; and $2,000,000 from the RIIF and $14,624,923 from the RBC for FY 2009. The FY 2009 appropriation from the RBC was not available until FY 2010 when the revenue bonds were issued. Major maintenance funds are used to correct deficiencies in State buildings and make a wide range of repairs. The funds are spent on projects vetted and prioritized by the Governor's Vertical Infrastructure Advisory Committee. State agencies that participate in the Vertical Infrastructure Program and the DAS staff work together to identify projects that will be presented to the Committee for funding consideration. The priorities that serve as the basis for ranking major maintenance requests are as follows in order: health, life, safety and emergency repairs; ongoing projects; nonemergency repairs to prevent building deterioration; renovation; replacement; and new construction. |
| Pg 1, Ln 8 |
Rebuild Iowa Infrastructure Fund appropriation to the DAS for major
maintenance, major repairs, and improvements to State facilities
throughout the State that are under the management of the Department.
DETAIL: The level of the funding has varied over the years. The DAS received $3,000,000 for major maintenance from the Revenue Bonds Capitals Fund (RBC) for FY 2011; $195,484 for major maintenance from the Restricted Capital Fund (RCF) for FY 2010; and $2,000,000 from the RIIF and $14,624,923 from the RBC for FY 2009. The FY 2009 appropriation from the RBC was not available until FY 2010 when the revenue bonds were issued. Major maintenance funds are used to correct deficiencies in State buildings and make a wide range of repairs. The funds are spent on projects vetted and prioritized by the Governor's Vertical Infrastructure Advisory Committee. State agencies that participate in the Vertical Infrastructure Program and the DAS staff work together to identify projects that will be presented to the Committee for funding consideration. The priorities that serve as the basis for ranking major maintenance requests are as follows in order: health, life, safety and emergency repairs; ongoing projects; nonemergency repairs to prevent building deterioration; renovation; replacement; and new construction. |
| Pg 1, Ln 8 |
Rebuild Iowa Infrastructure Fund appropriation to the DAS for major
maintenance, major repairs, and improvements to State facilities
throughout the State that are under the management of the Department.
DETAIL: The level of the funding has varied over the years. The DAS received $3,000,000 for major maintenance from the Revenue Bonds Capitals Fund (RBC) for FY 2011; $195,484 for major maintenance from the Restricted Capital Fund (RCF) for FY 2010; and $2,000,000 from the RIIF and $14,624,923 from the RBC for FY 2009. The FY 2009 appropriation from the RBC was not available until FY 2010 when the revenue bonds were issued. Major maintenance funds are used to correct deficiencies in State buildings and make a wide range of repairs. The funds are spent on projects vetted and prioritized by the Governor's Vertical Infrastructure Advisory Committee. State agencies that participate in the Vertical Infrastructure Program and the DAS staff work together to identify projects that will be presented to the Committee for funding consideration. The priorities that serve as the basis for ranking major maintenance requests are as follows in order: health, life, safety and emergency repairs; ongoing projects; nonemergency repairs to prevent building deterioration; renovation; replacement; and new construction. |
| Pg 1, Ln 15 |
Rebuild Iowa Infrastructure Fund appropriation to the DAS for the
restoration and maintenance of the Japanese Bell and Bell House monument
on the Capitol Complex grounds.
DETAIL: This is a new appropriation. The Japanese Bell and Bell House monument was a gift to the citizens of Iowa from the citizens of Yamanashi Prefecture, Japan for the assistance that Iowa sent after typhoons severely damaged crops, homes, and farmlands in 1959. The monument, a 2,000-pound temple bell of peace and friendship and the house structure, was presented to Iowa in 1962. The anniversary of the friendship and collaboration between the two Sister States will be celebrated in August 2011 with a visit from the Yamanashi Governor during the Iowa State Fair. The appropriation will be used for restoration and for continued maintenance of the monument, including site improvements and a commemorative plaque. Iowa Sister States has raised $52,500 to contribute to the monument’s restoration. Specifies that $15,000 of the appropriation will be deposited in the Monument Maintenance Account under Code Section 8A.321(14) to provide ongoing maintenance and repair to the monument. Any amount remaining from the $10,000 being used for site improvements and purchase of the plaque will deposit in the Monument Maintenance Account and will remain available for that purpose. |
| Pg 1, Ln 15 |
Rebuild Iowa Infrastructure Fund appropriation to the DAS for the
restoration and maintenance of the Japanese Bell and Bell House monument
on the Capitol Complex grounds.
DETAIL: This is a new appropriation. The Japanese Bell and Bell House monument was a gift to the citizens of Iowa from the citizens of Yamanashi Prefecture, Japan for the assistance that Iowa sent after typhoons severely damaged crops, homes, and farmlands in 1959. The monument, a 2,000-pound temple bell of peace and friendship and the house structure, was presented to Iowa in 1962. The anniversary of the friendship and collaboration between the two Sister States will be celebrated in August 2011 with a visit from the Yamanashi Governor during the Iowa State Fair. The appropriation will be used for restoration and for continued maintenance of the monument, including site improvements and a commemorative plaque. Iowa Sister States has raised $52,500 to contribute to the monument’s restoration. Specifies that $15,000 of the appropriation will be deposited in the Monument Maintenance Account under Code Section 8A.321(14) to provide ongoing maintenance and repair to the monument. Any amount remaining from the $10,000 being used for site improvements and purchase of the plaque will deposit in the Monument Maintenance Account and will remain available for that purpose. |
| Pg 1, Ln 15 |
Rebuild Iowa Infrastructure Fund appropriation to the DAS for the
restoration and maintenance of the Japanese Bell and Bell House monument
on the Capitol Complex grounds.
DETAIL: This is a new appropriation. The Japanese Bell and Bell House monument was a gift to the citizens of Iowa from the citizens of Yamanashi Prefecture, Japan for the assistance that Iowa sent after typhoons severely damaged crops, homes, and farmlands in 1959. The monument, a 2,000-pound temple bell of peace and friendship and the house structure, was presented to Iowa in 1962. The anniversary of the friendship and collaboration between the two Sister States will be celebrated in August 2011 with a visit from the Yamanashi Governor during the Iowa State Fair. The appropriation will be used for restoration and for continued maintenance of the monument, including site improvements and a commemorative plaque. Iowa Sister States has raised $52,500 to contribute to the monument’s restoration. Specifies that $15,000 of the appropriation will be deposited in the Monument Maintenance Account under Code Section 8A.321(14) to provide ongoing maintenance and repair to the monument. Any amount remaining from the $10,000 being used for site improvements and purchase of the plaque will deposit in the Monument Maintenance Account and will remain available for that purpose. |
| Pg 1, Ln 32 |
Rebuild Iowa Infrastructure Fund appropriation to the DAS for repairs to
the State Historical Building.
DETAIL: This is a new appropriation. From 2001 through 2007, repairs for the exterior and skylights of the Historical Building have been funded from the DAS Major Maintenance appropriation, totaling approximately $2,100,000. Due to the additional funding needed for exterior repairs and the potential drain on major maintenance funding, the request for Historical Building repairs was submitted separately. Funds will be used to repair and replace exterior granite wall panels, refurbish and repair skylights and repair the exterior sealant deficiencies to eliminate water leaks. |
| Pg 1, Ln 32 |
Rebuild Iowa Infrastructure Fund appropriation to the DAS for repairs to
the State Historical Building.
DETAIL: This is a new appropriation. From 2001 through 2007, repairs for the exterior and skylights of the Historical Building have been funded from the DAS Major Maintenance appropriation, totaling approximately $2,100,000. Due to the additional funding needed for exterior repairs and the potential drain on major maintenance funding, the request for Historical Building repairs was submitted separately. Funds will be used to repair and replace exterior granite wall panels, refurbish and repair skylights and repair the exterior sealant deficiencies to eliminate water leaks. |
| Pg 1, Ln 33 |
Rebuild Iowa Infrastructure Fund appropriation to the DAS for security
and safety improvements in the Lucas Building.
DETAIL: This is a new appropriation. Funds will be used for upgrades to security card readers and improvements to the fire safety systems, including fire sprinkler and fire detection, at the offices of the Secretary of State in the Lucas Building. |
| Pg 1, Ln 33 |
Rebuild Iowa Infrastructure Fund appropriation to the DAS for security
and safety improvements in the Lucas Building.
DETAIL: This is a new appropriation. Funds will be used for upgrades to security card readers and improvements to the fire safety systems, including fire sprinkler and fire detection, at the offices of the Secretary of State in the Lucas Building. |
| Pg 2, Ln 4 |
Rebuild Iowa Infrastructure Fund appropriation to the Department for the
Blind for replacement of air handlers and related improvements.
DETAIL: This is a new appropriation for FY 2012, but has been requested either from major maintenance through the Vertical Infrastructure Advisory Committee or as a Department budget request since FY 2007. Funds will be used to replace three air handler units that are 44 to 50 years old with one common central station to provide maximum efficiency and performance. The age of the current units results in inefficiencies and poor air quality as well as regular maintenance issues. Total funds needed for the air handler central station and related work is $1,004,534. A portion of the funds, $37,140, will be for ballasted roof replacement and related work. In addition, $24,000 will be used for the replacement of lateral water service line into the building. All work will be completed at the Department's main office building at 524 4th Street in Des Moines. This building has the main offices as well as the dormitory for the Adult Orientation and Adjustment Center. |
| Pg 2, Ln 4 |
Rebuild Iowa Infrastructure Fund appropriation to the Department for the
Blind for replacement of air handlers and related improvements.
DETAIL: This is a new appropriation for FY 2012, but has been requested either from major maintenance through the Vertical Infrastructure Advisory Committee or as a Department budget request since FY 2007. Funds will be used to replace three air handler units that are 44 to 50 years old with one common central station to provide maximum efficiency and performance. The age of the current units results in inefficiencies and poor air quality as well as regular maintenance issues. Total funds needed for the air handler central station and related work is $1,004,534. A portion of the funds, $37,140, will be for ballasted roof replacement and related work. In addition, $24,000 will be used for the replacement of lateral water service line into the building. All work will be completed at the Department's main office building at 524 4th Street in Des Moines. This building has the main offices as well as the dormitory for the Adult Orientation and Adjustment Center. |
| Pg 2, Ln 4 |
Rebuild Iowa Infrastructure Fund appropriation to the Department for the
Blind for replacement of air handlers and related improvements.
DETAIL: This is a new appropriation for FY 2012, but has been requested either from major maintenance through the Vertical Infrastructure Advisory Committee or as a Department budget request since FY 2007. Funds will be used to replace three air handler units that are 44 to 50 years old with one common central station to provide maximum efficiency and performance. The age of the current units results in inefficiencies and poor air quality as well as regular maintenance issues. Total funds needed for the air handler central station and related work is $1,004,534. A portion of the funds, $37,140, will be for ballasted roof replacement and related work. In addition, $24,000 will be used for the replacement of lateral water service line into the building. All work will be completed at the Department's main office building at 524 4th Street in Des Moines. This building has the main offices as well as the dormitory for the Adult Orientation and Adjustment Center. |
| Pg 2, Ln 8 | Rebuild Iowa Infrastructure Fund appropriations to the Department of
Corrections for construction and one-time costs associated with the new
Iowa State Penitentiary at Fort Madison.
DETAIL: Provides a total of $26,424,201 over three fiscal years for the one-time costs. The funds will be used for the furniture, fixture, and equipment costs to complete construction for a new maximum security prison at Fort Madison. One-time costs include generators, building management security systems, cabinets, camera and recording systems, furnishings, and other supplies and equipment. The construction project received an FY 2009 appropriation of $130,677,500 from the FY 2009 Prison Bonding Fund in SF 2432 (FY 2009 Infrastructure Appropriations Act). The new prison is expected to be substantially complete by spring 2013 and be open and running by or before January 2014. According to design work to date, the new prison will have 800 beds in the maximum security prison, representing a net gain of 120 beds. |
| Pg 2, Ln 8 | Rebuild Iowa Infrastructure Fund appropriations to the Department of
Corrections for construction and one-time costs associated with the new
Iowa State Penitentiary at Fort Madison.
DETAIL: Provides a total of $26,424,201 over three fiscal years for the one-time costs. The funds will be used for the furniture, fixture, and equipment costs to complete construction for a new maximum security prison at Fort Madison. One-time costs include generators, building management security systems, cabinets, camera and recording systems, furnishings, and other supplies and equipment. The construction project received an FY 2009 appropriation of $130,677,500 from the FY 2009 Prison Bonding Fund in SF 2432 (FY 2009 Infrastructure Appropriations Act). The new prison is expected to be substantially complete by spring 2013 and be open and running by or before January 2014. According to design work to date, the new prison will have 800 beds in the maximum security prison, representing a net gain of 120 beds. |
| Pg 2, Ln 8 | Rebuild Iowa Infrastructure Fund appropriations to the Department of
Corrections for construction and one-time costs associated with the new
Iowa State Penitentiary at Fort Madison.
DETAIL: Provides a total of $26,424,201 over three fiscal years for the one-time costs. The funds will be used for the furniture, fixture, and equipment costs to complete construction for a new maximum security prison at Fort Madison. One-time costs include generators, building management security systems, cabinets, camera and recording systems, furnishings, and other supplies and equipment. The construction project received an FY 2009 appropriation of $130,677,500 from the FY 2009 Prison Bonding Fund in SF 2432 (FY 2009 Infrastructure Appropriations Act). The new prison is expected to be substantially complete by spring 2013 and be open and running by or before January 2014. According to design work to date, the new prison will have 800 beds in the maximum security prison, representing a net gain of 120 beds. |
| Pg 2, Ln 8 | Rebuild Iowa Infrastructure Fund appropriations to the Department of
Corrections for construction and one-time costs associated with the new
Iowa State Penitentiary at Fort Madison.
DETAIL: Provides a total of $26,424,201 over three fiscal years for the one-time costs. The funds will be used for the furniture, fixture, and equipment costs to complete construction for a new maximum security prison at Fort Madison. One-time costs include generators, building management security systems, cabinets, camera and recording systems, furnishings, and other supplies and equipment. The construction project received an FY 2009 appropriation of $130,677,500 from the FY 2009 Prison Bonding Fund in SF 2432 (FY 2009 Infrastructure Appropriations Act). The new prison is expected to be substantially complete by spring 2013 and be open and running by or before January 2014. According to design work to date, the new prison will have 800 beds in the maximum security prison, representing a net gain of 120 beds. |
| Pg 2, Ln 8 | Rebuild Iowa Infrastructure Fund appropriations to the Department of
Corrections for construction and one-time costs associated with the new
Iowa State Penitentiary at Fort Madison.
DETAIL: Provides a total of $26,424,201 over three fiscal years for the one-time costs. The funds will be used for the furniture, fixture, and equipment costs to complete construction for a new maximum security prison at Fort Madison. One-time costs include generators, building management security systems, cabinets, camera and recording systems, furnishings, and other supplies and equipment. The construction project received an FY 2009 appropriation of $130,677,500 from the FY 2009 Prison Bonding Fund in SF 2432 (FY 2009 Infrastructure Appropriations Act). The new prison is expected to be substantially complete by spring 2013 and be open and running by or before January 2014. According to design work to date, the new prison will have 800 beds in the maximum security prison, representing a net gain of 120 beds. |
| Pg 2, Ln 11 |
Rebuild Iowa Infrastructure Fund appropriations to the Department of
Corrections for construction and one-time costs associated with the
Mitchellville prison.
DETAIL: Provides a total of $35,521,658 over three fiscal years for construction and one-time costs. These appropriations are in addition to the $4,130,952 appropriated in Section 5 from the RBC, for a total of $39,652,610. According to the DOC, an estimated $21,899,055 of this amount will be used for one-time costs, including generators, building management security systems, cabinets, camera and recording systems, furnishings, and other supplies and equipment. The additional $17,753,555 will be used for construction, demolition, and renovation to provide four updated buildings (Building P, Building Z, Building N, and Maintenance Building/Warehouse). The buildings will provide facilities for centralized services including training rooms for educational and vocational classes, an activities center, a library, a support building for the Minimum-Live-Out facility, and a central warehouse outside of the security perimeter. The construction project received $67,979,000 in appropriations so far. This total includes $47,500,000 from the RBC during the 2009 Session. In addition, the project is slated to receive $11,700,000 for FY 2012 and $8,779,000 for FY 2013 from the RIIF. These last two appropriations are current law and were previously enacted and amended during the 2008 and 2009 Legislative Sessions. With the appropriations in this Bill, the total amount appropriated for construction and one-time costs for completion over the life of the project is $107,631,610. The planned construction will provide an expanded facility that will have 888 beds. This facility will provide a net gain of approximately 337 beds. Substantial construction is expected to be completed by spring 2013 and the facility should be open by or before January 2014. |
| Pg 2, Ln 11 |
Rebuild Iowa Infrastructure Fund appropriations to the Department of
Corrections for construction and one-time costs associated with the
Mitchellville prison.
DETAIL: Provides a total of $35,521,658 over three fiscal years for construction and one-time costs. These appropriations are in addition to the $4,130,952 appropriated in Section 5 from the RBC, for a total of $39,652,610. According to the DOC, an estimated $21,899,055 of this amount will be used for one-time costs, including generators, building management security systems, cabinets, camera and recording systems, furnishings, and other supplies and equipment. The additional $17,753,555 will be used for construction, demolition, and renovation to provide four updated buildings (Building P, Building Z, Building N, and Maintenance Building/Warehouse). The buildings will provide facilities for centralized services including training rooms for educational and vocational classes, an activities center, a library, a support building for the Minimum-Live-Out facility, and a central warehouse outside of the security perimeter. The construction project received $67,979,000 in appropriations so far. This total includes $47,500,000 from the RBC during the 2009 Session. In addition, the project is slated to receive $11,700,000 for FY 2012 and $8,779,000 for FY 2013 from the RIIF. These last two appropriations are current law and were previously enacted and amended during the 2008 and 2009 Legislative Sessions. With the appropriations in this Bill, the total amount appropriated for construction and one-time costs for completion over the life of the project is $107,631,610. The planned construction will provide an expanded facility that will have 888 beds. This facility will provide a net gain of approximately 337 beds. Substantial construction is expected to be completed by spring 2013 and the facility should be open by or before January 2014. |
| Pg 2, Ln 11 |
Rebuild Iowa Infrastructure Fund appropriations to the Department of
Corrections for construction and one-time costs associated with the
Mitchellville prison.
DETAIL: Provides a total of $35,521,658 over three fiscal years for construction and one-time costs. These appropriations are in addition to the $4,130,952 appropriated in Section 5 from the RBC, for a total of $39,652,610. According to the DOC, an estimated $21,899,055 of this amount will be used for one-time costs, including generators, building management security systems, cabinets, camera and recording systems, furnishings, and other supplies and equipment. The additional $17,753,555 will be used for construction, demolition, and renovation to provide four updated buildings (Building P, Building Z, Building N, and Maintenance Building/Warehouse). The buildings will provide facilities for centralized services including training rooms for educational and vocational classes, an activities center, a library, a support building for the Minimum-Live-Out facility, and a central warehouse outside of the security perimeter. The construction project received $67,979,000 in appropriations so far. This total includes $47,500,000 from the RBC during the 2009 Session. In addition, the project is slated to receive $11,700,000 for FY 2012 and $8,779,000 for FY 2013 from the RIIF. These last two appropriations are current law and were previously enacted and amended during the 2008 and 2009 Legislative Sessions. With the appropriations in this Bill, the total amount appropriated for construction and one-time costs for completion over the life of the project is $107,631,610. The planned construction will provide an expanded facility that will have 888 beds. This facility will provide a net gain of approximately 337 beds. Substantial construction is expected to be completed by spring 2013 and the facility should be open by or before January 2014. |
| Pg 2, Ln 11 |
Rebuild Iowa Infrastructure Fund appropriations to the Department of
Corrections for construction and one-time costs associated with the
Mitchellville prison.
DETAIL: Provides a total of $35,521,658 over three fiscal years for construction and one-time costs. These appropriations are in addition to the $4,130,952 appropriated in Section 5 from the RBC, for a total of $39,652,610. According to the DOC, an estimated $21,899,055 of this amount will be used for one-time costs, including generators, building management security systems, cabinets, camera and recording systems, furnishings, and other supplies and equipment. The additional $17,753,555 will be used for construction, demolition, and renovation to provide four updated buildings (Building P, Building Z, Building N, and Maintenance Building/Warehouse). The buildings will provide facilities for centralized services including training rooms for educational and vocational classes, an activities center, a library, a support building for the Minimum-Live-Out facility, and a central warehouse outside of the security perimeter. The construction project received $67,979,000 in appropriations so far. This total includes $47,500,000 from the RBC during the 2009 Session. In addition, the project is slated to receive $11,700,000 for FY 2012 and $8,779,000 for FY 2013 from the RIIF. These last two appropriations are current law and were previously enacted and amended during the 2008 and 2009 Legislative Sessions. With the appropriations in this Bill, the total amount appropriated for construction and one-time costs for completion over the life of the project is $107,631,610. The planned construction will provide an expanded facility that will have 888 beds. This facility will provide a net gain of approximately 337 beds. Substantial construction is expected to be completed by spring 2013 and the facility should be open by or before January 2014. |
| Pg 2, Ln 17 |
Rebuild Iowa Infrastructure Fund appropriation to the Department of
Economic Development for the Accelerated Career Education (ACE) Program
vertical infrastructure projects at community colleges.
DETAIL: This is a decrease of $500,000 compared to estimated FY 2011. The Program received $5,500,000 from the RBC2 in FY 2011 and $5,500,000 from an FY 2009 RBC appropriation that was not available until FY 2010. The Program received $11,000,000 for combined FY 2008 and FY 2009 from the RIIF and the RC2 (tobacco fund). Projects funded by the State's appropriation must meet the definition of vertical infrastructure. In previous fiscal years, the funds have been used for constructing or expanding facilities for programs in dental hygienics, diesel technology, physical therapy, welding technology, mortuary science, automotive technology, nursing, health information, laboratory technicians, electromechanical systems technology, culinary arts, and wind energy and turbine technology. Funds are allocated equally to all the community colleges. If a college does not use all of their allocated funding, another college may be awarded the additional amounts. The ACE Program, in general, includes a contribution by businesses and prospective employers for 20.00% of the costs associated with the specific training program costs. The businesses qualify to offset these matching fund costs with State income tax credits. Students are not employees of the businesses when taking the training class, but may look for work in the sponsoring business after graduation from the Program. |
| Pg 2, Ln 17 |
Rebuild Iowa Infrastructure Fund appropriation to the Department of
Economic Development for the Accelerated Career Education (ACE) Program
vertical infrastructure projects at community colleges.
DETAIL: This is a decrease of $500,000 compared to estimated FY 2011. The Program received $5,500,000 from the RBC2 in FY 2011 and $5,500,000 from an FY 2009 RBC appropriation that was not available until FY 2010. The Program received $11,000,000 for combined FY 2008 and FY 2009 from the RIIF and the RC2 (tobacco fund). Projects funded by the State's appropriation must meet the definition of vertical infrastructure. In previous fiscal years, the funds have been used for constructing or expanding facilities for programs in dental hygienics, diesel technology, physical therapy, welding technology, mortuary science, automotive technology, nursing, health information, laboratory technicians, electromechanical systems technology, culinary arts, and wind energy and turbine technology. Funds are allocated equally to all the community colleges. If a college does not use all of their allocated funding, another college may be awarded the additional amounts. The ACE Program, in general, includes a contribution by businesses and prospective employers for 20.00% of the costs associated with the specific training program costs. The businesses qualify to offset these matching fund costs with State income tax credits. Students are not employees of the businesses when taking the training class, but may look for work in the sponsoring business after graduation from the Program. |
| Pg 2, Ln 17 |
Rebuild Iowa Infrastructure Fund appropriation to the Department of
Economic Development for the Accelerated Career Education (ACE) Program
vertical infrastructure projects at community colleges.
DETAIL: This is a decrease of $500,000 compared to estimated FY 2011. The Program received $5,500,000 from the RBC2 in FY 2011 and $5,500,000 from an FY 2009 RBC appropriation that was not available until FY 2010. The Program received $11,000,000 for combined FY 2008 and FY 2009 from the RIIF and the RC2 (tobacco fund). Projects funded by the State's appropriation must meet the definition of vertical infrastructure. In previous fiscal years, the funds have been used for constructing or expanding facilities for programs in dental hygienics, diesel technology, physical therapy, welding technology, mortuary science, automotive technology, nursing, health information, laboratory technicians, electromechanical systems technology, culinary arts, and wind energy and turbine technology. Funds are allocated equally to all the community colleges. If a college does not use all of their allocated funding, another college may be awarded the additional amounts. The ACE Program, in general, includes a contribution by businesses and prospective employers for 20.00% of the costs associated with the specific training program costs. The businesses qualify to offset these matching fund costs with State income tax credits. Students are not employees of the businesses when taking the training class, but may look for work in the sponsoring business after graduation from the Program. |
| Pg 2, Ln 26 |
Rebuild Iowa Infrastructure Fund appropriation to the Department of
Education for the Iowa Public Broadcasting Division to purchase a
building.
DETAIL: This is a new appropriation. Iowa Public Television (IPTV) has been leasing the building since October 1997. Within the lease agreement there is an option to purchase the building at $1,255,000 at the end of the lease. The IPTV's lease is ending and it is not clear if there is an option to lease again, but the purchase option remains available. The IPTV plans to purchase the building within the first quarter of FY 2012. |
| Pg 2, Ln 26 |
Rebuild Iowa Infrastructure Fund appropriation to the Department of
Education for the Iowa Public Broadcasting Division to purchase a
building.
DETAIL: This is a new appropriation. Iowa Public Television (IPTV) has been leasing the building since October 1997. Within the lease agreement there is an option to purchase the building at $1,255,000 at the end of the lease. The IPTV's lease is ending and it is not clear if there is an option to lease again, but the purchase option remains available. The IPTV plans to purchase the building within the first quarter of FY 2012. |
| Pg 2, Ln 26 |
Rebuild Iowa Infrastructure Fund appropriation to the Department of
Education for the Iowa Public Broadcasting Division to purchase a
building.
DETAIL: This is a new appropriation. Iowa Public Television (IPTV) has been leasing the building since October 1997. Within the lease agreement there is an option to purchase the building at $1,255,000 at the end of the lease. The IPTV's lease is ending and it is not clear if there is an option to lease again, but the purchase option remains available. The IPTV plans to purchase the building within the first quarter of FY 2012. |
| Pg 2, Ln 28 |
Rebuild Iowa Infrastructure Fund appropriation to the Department of
Natural Resources (DNR) for the floodplain management and dam safety
program at the DNR. This appropriation notwithstands the definition of
vertical infrastructure.
DETAIL: Maintains the current level of funding compared to estimated FY 2011. Funds will be used to continue the floodplain management and dam safety program. The DNR uses the funds to provide dam safety inspections, contracting with U.S. Geological Survey for stream gages, coordinating with the Iowa Flood Center to provide bridge sensors, and providing technical assistance to local authorities related to floodplain and dam safety projects and to the National Flood Insurance Program. In addition, the funds are used for floodplain mapping for 14 counties. These counties were not included in the $15,000,000 received from a federal Community Development Block Grant to create and update floodplain maps for the 85 counties that were declared federal disaster areas in 2008. In FY 2011, the DNR has budgeted $238,118 for floodplain mapping for the 14 counties. The counties are Osceola, Dickinson, Emmet, Sioux, O'Brien, Clay, Plymouth, Buena Vista, Woodbury, Ida, Sac, Calhoun, Shelby, and Jefferson. Specifies that up to $400,000 of the $2,000,000 may be used for stream gages for purposes of tracking and predicting flood events and gathering data. The DNR has a contract with the U.S. Geological Survey for the purchase and use of the gages. In FY 2011, approximately $112,500 is budgeted for stream gages. The gages provide long-term data sets used in floodplain determinations, flood frequency analysis, flood forecasting and warnings. To complement and provide additional data, the bridge sensors incorporated by the Iowa Flood Center and purchased with approximately $175,000 of this appropriation, are used to provide real-time data on smaller streams and rivers and provide local flood forecasting and warnings. |
| Pg 2, Ln 28 |
Rebuild Iowa Infrastructure Fund appropriation to the Department of
Natural Resources (DNR) for the floodplain management and dam safety
program at the DNR. This appropriation notwithstands the definition of
vertical infrastructure.
DETAIL: Maintains the current level of funding compared to estimated FY 2011. Funds will be used to continue the floodplain management and dam safety program. The DNR uses the funds to provide dam safety inspections, contracting with U.S. Geological Survey for stream gages, coordinating with the Iowa Flood Center to provide bridge sensors, and providing technical assistance to local authorities related to floodplain and dam safety projects and to the National Flood Insurance Program. In addition, the funds are used for floodplain mapping for 14 counties. These counties were not included in the $15,000,000 received from a federal Community Development Block Grant to create and update floodplain maps for the 85 counties that were declared federal disaster areas in 2008. In FY 2011, the DNR has budgeted $238,118 for floodplain mapping for the 14 counties. The counties are Osceola, Dickinson, Emmet, Sioux, O'Brien, Clay, Plymouth, Buena Vista, Woodbury, Ida, Sac, Calhoun, Shelby, and Jefferson. Specifies that up to $400,000 of the $2,000,000 may be used for stream gages for purposes of tracking and predicting flood events and gathering data. The DNR has a contract with the U.S. Geological Survey for the purchase and use of the gages. In FY 2011, approximately $112,500 is budgeted for stream gages. The gages provide long-term data sets used in floodplain determinations, flood frequency analysis, flood forecasting and warnings. To complement and provide additional data, the bridge sensors incorporated by the Iowa Flood Center and purchased with approximately $175,000 of this appropriation, are used to provide real-time data on smaller streams and rivers and provide local flood forecasting and warnings. |
| Pg 2, Ln 28 |
Rebuild Iowa Infrastructure Fund appropriation to the Department of
Natural Resources (DNR) for the floodplain management and dam safety
program at the DNR. This appropriation notwithstands the definition of
vertical infrastructure.
DETAIL: Maintains the current level of funding compared to estimated FY 2011. Funds will be used to continue the floodplain management and dam safety program. The DNR uses the funds to provide dam safety inspections, contracting with U.S. Geological Survey for stream gages, coordinating with the Iowa Flood Center to provide bridge sensors, and providing technical assistance to local authorities related to floodplain and dam safety projects and to the National Flood Insurance Program. In addition, the funds are used for floodplain mapping for 14 counties. These counties were not included in the $15,000,000 received from a federal Community Development Block Grant to create and update floodplain maps for the 85 counties that were declared federal disaster areas in 2008. In FY 2011, the DNR has budgeted $238,118 for floodplain mapping for the 14 counties. The counties are Osceola, Dickinson, Emmet, Sioux, O'Brien, Clay, Plymouth, Buena Vista, Woodbury, Ida, Sac, Calhoun, Shelby, and Jefferson. Specifies that up to $400,000 of the $2,000,000 may be used for stream gages for purposes of tracking and predicting flood events and gathering data. The DNR has a contract with the U.S. Geological Survey for the purchase and use of the gages. In FY 2011, approximately $112,500 is budgeted for stream gages. The gages provide long-term data sets used in floodplain determinations, flood frequency analysis, flood forecasting and warnings. To complement and provide additional data, the bridge sensors incorporated by the Iowa Flood Center and purchased with approximately $175,000 of this appropriation, are used to provide real-time data on smaller streams and rivers and provide local flood forecasting and warnings. |
| Pg 2, Ln 28 |
Rebuild Iowa Infrastructure Fund appropriation to the Department of
Natural Resources (DNR) for the floodplain management and dam safety
program at the DNR. This appropriation notwithstands the definition of
vertical infrastructure.
DETAIL: Maintains the current level of funding compared to estimated FY 2011. Funds will be used to continue the floodplain management and dam safety program. The DNR uses the funds to provide dam safety inspections, contracting with U.S. Geological Survey for stream gages, coordinating with the Iowa Flood Center to provide bridge sensors, and providing technical assistance to local authorities related to floodplain and dam safety projects and to the National Flood Insurance Program. In addition, the funds are used for floodplain mapping for 14 counties. These counties were not included in the $15,000,000 received from a federal Community Development Block Grant to create and update floodplain maps for the 85 counties that were declared federal disaster areas in 2008. In FY 2011, the DNR has budgeted $238,118 for floodplain mapping for the 14 counties. The counties are Osceola, Dickinson, Emmet, Sioux, O'Brien, Clay, Plymouth, Buena Vista, Woodbury, Ida, Sac, Calhoun, Shelby, and Jefferson. Specifies that up to $400,000 of the $2,000,000 may be used for stream gages for purposes of tracking and predicting flood events and gathering data. The DNR has a contract with the U.S. Geological Survey for the purchase and use of the gages. In FY 2011, approximately $112,500 is budgeted for stream gages. The gages provide long-term data sets used in floodplain determinations, flood frequency analysis, flood forecasting and warnings. To complement and provide additional data, the bridge sensors incorporated by the Iowa Flood Center and purchased with approximately $175,000 of this appropriation, are used to provide real-time data on smaller streams and rivers and provide local flood forecasting and warnings. |
| Pg 2, Ln 35 | Rebuild Iowa Infrastructure Fund appropriation to the DNR for lake
restoration, dredging, and water quality projects. This appropriation
notwithstands the definition of vertical infrastructure.
DETAIL: Funding levels have varied in the last few fiscal years. In FY 2011, the DNR received $3,000,000 from the RBC2 and $7,000,000 from the RBC for a total of $10,000,000. For FY 2009 and FY 2010, the DNR received a total of $12,800,000 comprised of $2,800,000 from the RIIF for FY 2010 and $10,000,000 from the RBC for FY 2009, but the RBC funds were not available until FY 2010. In FY 2008, the funding was $8,600,000 from the RIIF. The funds are used for projects identified in the Lake Restoration Annual Report and Plan focusing on the first 35 projects that make up the priority list of lake candidates. The DNR must implement the projects in accordance with the Lake Restoration Report and Plan, submitted annually to the Transportation, Infrastructure, and Capitals Appropriations Subcommittee by January 1. The Lake Restoration 2010 Report and 2011 Plan proposes using FY 2012 funding for Storm Lake, Clear Lake, Carter Lake, Five Island Lake, Lake Darling, Lost Island Lake, Lake Manawa, Prairie Rose Lake, Black Hawk Lake, Easter Lake, Little River Lake, Iowa Great Lakes, the State's natural shallow lakes such as Virgin Lake, and some other related projects. |
| Pg 2, Ln 35 | Rebuild Iowa Infrastructure Fund appropriation to the DNR for lake
restoration, dredging, and water quality projects. This appropriation
notwithstands the definition of vertical infrastructure.
DETAIL: Funding levels have varied in the last few fiscal years. In FY 2011, the DNR received $3,000,000 from the RBC2 and $7,000,000 from the RBC for a total of $10,000,000. For FY 2009 and FY 2010, the DNR received a total of $12,800,000 comprised of $2,800,000 from the RIIF for FY 2010 and $10,000,000 from the RBC for FY 2009, but the RBC funds were not available until FY 2010. In FY 2008, the funding was $8,600,000 from the RIIF. The funds are used for projects identified in the Lake Restoration Annual Report and Plan focusing on the first 35 projects that make up the priority list of lake candidates. The DNR must implement the projects in accordance with the Lake Restoration Report and Plan, submitted annually to the Transportation, Infrastructure, and Capitals Appropriations Subcommittee by January 1. The Lake Restoration 2010 Report and 2011 Plan proposes using FY 2012 funding for Storm Lake, Clear Lake, Carter Lake, Five Island Lake, Lake Darling, Lost Island Lake, Lake Manawa, Prairie Rose Lake, Black Hawk Lake, Easter Lake, Little River Lake, Iowa Great Lakes, the State's natural shallow lakes such as Virgin Lake, and some other related projects. |
| Pg 3, Ln 7 |
Rebuild Iowa Infrastructure Fund appropriation to the Department of
Public Defense (DPD) for major maintenance projects at National Guard
facilities throughout the State.
DETAIL: This is an increase of $500,000 compared to estimated FY 2011. State funds for FY 2012 will be matched with $3,500,000 in federal funds. The first $1,500,000 receives a 1:1 match and anything above that amount receives a 4:1 match from federal funds. Funds provide major maintenance to the National Guard’s readiness centers. Projects include roof repair, system upgrades, and other major maintenance projects at all 43 armories and numerous other buildings that are maintained by the Iowa National Guard. |
| Pg 3, Ln 7 |
Rebuild Iowa Infrastructure Fund appropriation to the Department of
Public Defense (DPD) for major maintenance projects at National Guard
facilities throughout the State.
DETAIL: This is an increase of $500,000 compared to estimated FY 2011. State funds for FY 2012 will be matched with $3,500,000 in federal funds. The first $1,500,000 receives a 1:1 match and anything above that amount receives a 4:1 match from federal funds. Funds provide major maintenance to the National Guard’s readiness centers. Projects include roof repair, system upgrades, and other major maintenance projects at all 43 armories and numerous other buildings that are maintained by the Iowa National Guard. |
| Pg 3, Ln 7 |
Rebuild Iowa Infrastructure Fund appropriation to the Department of
Public Defense (DPD) for major maintenance projects at National Guard
facilities throughout the State.
DETAIL: This is an increase of $500,000 compared to estimated FY 2011. State funds for FY 2012 will be matched with $3,500,000 in federal funds. The first $1,500,000 receives a 1:1 match and anything above that amount receives a 4:1 match from federal funds. Funds provide major maintenance to the National Guard’s readiness centers. Projects include roof repair, system upgrades, and other major maintenance projects at all 43 armories and numerous other buildings that are maintained by the Iowa National Guard. |
| Pg 3, Ln 10 |
Rebuild Iowa Infrastructure Fund appropriation to the DPD for renovation
and facilities improvements at the Muscatine Readiness Center.
DETAIL: This is a new appropriation for FY 2012. The funds will be used for improvements that are not covered by the federal Base Realignment and Closure (BRAC) 2005 funding. The State funds will provide for improvements in a family readiness room, baby changing station, ICN installation, and some other improvements not covered by BRAC. The facility is otherwise being constructed with 100.00% federal funds and is expected to receive $7,800,000 in federal funding. |
| Pg 3, Ln 10 |
Rebuild Iowa Infrastructure Fund appropriation to the DPD for renovation
and facilities improvements at the Muscatine Readiness Center.
DETAIL: This is a new appropriation for FY 2012. The funds will be used for improvements that are not covered by the federal Base Realignment and Closure (BRAC) 2005 funding. The State funds will provide for improvements in a family readiness room, baby changing station, ICN installation, and some other improvements not covered by BRAC. The facility is otherwise being constructed with 100.00% federal funds and is expected to receive $7,800,000 in federal funding. |
| Pg 3, Ln 15 |
Rebuild Iowa Infrastructure Fund appropriation to the DPD for
improvement projects at National Guard readiness centers around the
State.
DETAIL: Maintains the current level of funding. The Statewide modernization effort received $1,800,000 each year from FY 2009 through FY 2011. State funds were matched 1:1 with federal funds. The federal funds, known as "Murtha funds," were part of a one-time increase of $94,900,000 that was made available through the federal FY 2008 Department of Defense Appropriation Act, H.R. 3222, to accelerate the modernization of critical operational and support facilities. Funds from prior years were used to improve readiness centers in Oelwein, Charles City, Perry, Audubon, Knoxville and Iowa City. The FY 2012 funds will receive a $1,800,000 federal match and will be used for improvements at the Washington Readiness Center and Camp Dodge Joint Forces Miller Armory. Improvements at the Washington Readiness Center include renovation to modernize the administrative and training areas and provide additional supply, vault, and classroom space. In addition, funds will be used for modernizing the kitchen, electrical system, latrines, HVAC system, and other areas of the facility. Improvements to the Miller Armory at Camp Dodge includes HVAC system and controls, electrical lighting, latrines, kitchen, vaults, unit supply and a drill floor. The Miller Armory is a 49,000 square foot building, built in 1976. |
| Pg 3, Ln 15 |
Rebuild Iowa Infrastructure Fund appropriation to the DPD for
improvement projects at National Guard readiness centers around the
State.
DETAIL: Maintains the current level of funding. The Statewide modernization effort received $1,800,000 each year from FY 2009 through FY 2011. State funds were matched 1:1 with federal funds. The federal funds, known as "Murtha funds," were part of a one-time increase of $94,900,000 that was made available through the federal FY 2008 Department of Defense Appropriation Act, H.R. 3222, to accelerate the modernization of critical operational and support facilities. Funds from prior years were used to improve readiness centers in Oelwein, Charles City, Perry, Audubon, Knoxville and Iowa City. The FY 2012 funds will receive a $1,800,000 federal match and will be used for improvements at the Washington Readiness Center and Camp Dodge Joint Forces Miller Armory. Improvements at the Washington Readiness Center include renovation to modernize the administrative and training areas and provide additional supply, vault, and classroom space. In addition, funds will be used for modernizing the kitchen, electrical system, latrines, HVAC system, and other areas of the facility. Improvements to the Miller Armory at Camp Dodge includes HVAC system and controls, electrical lighting, latrines, kitchen, vaults, unit supply and a drill floor. The Miller Armory is a 49,000 square foot building, built in 1976. |
| Pg 3, Ln 17 |
Rebuild Iowa Infrastructure Fund appropriation to the DPD for
construction upgrades at the Camp Dodge Readiness Center.
DETAIL: This is a new appropriation, but is part of a multiyear effort to upgrade existing infrastructure systems, including the sanitary and sewer systems, at Camp Dodge. The additional use of the facility for training and military and paramilitary units have stressed the existing system and the current system does not meet the federal and State environmental requirements. Camp Dodge celebrated its 100th year anniversary in FY 2009 and includes 4,500 acres and 325 buildings, and 1,200 full-time employees. The military installation is similar to a small town in terms of infrastructure systems. The post is home to the Joint Headquarters, the State Emergency Operations Center, National Maintenance and Battle Command Training Centers, the Iowa Gold Star Museum, and other entities. The FY 2012 appropriation will receive $5,600,000 in federal matching funds. Camp Dodge has been undergoing several postwide infrastructure upgrades and modernization efforts over the last decade, including electrical, water, phone and cable, and other systems. |
| Pg 3, Ln 17 |
Rebuild Iowa Infrastructure Fund appropriation to the DPD for
construction upgrades at the Camp Dodge Readiness Center.
DETAIL: This is a new appropriation, but is part of a multiyear effort to upgrade existing infrastructure systems, including the sanitary and sewer systems, at Camp Dodge. The additional use of the facility for training and military and paramilitary units have stressed the existing system and the current system does not meet the federal and State environmental requirements. Camp Dodge celebrated its 100th year anniversary in FY 2009 and includes 4,500 acres and 325 buildings, and 1,200 full-time employees. The military installation is similar to a small town in terms of infrastructure systems. The post is home to the Joint Headquarters, the State Emergency Operations Center, National Maintenance and Battle Command Training Centers, the Iowa Gold Star Museum, and other entities. The FY 2012 appropriation will receive $5,600,000 in federal matching funds. Camp Dodge has been undergoing several postwide infrastructure upgrades and modernization efforts over the last decade, including electrical, water, phone and cable, and other systems. |
| Pg 3, Ln 20 |
Rebuild Iowa Infrastructure Fund appropriation to the DPD for renovation
of the Joint Forces Headquarters building.
DETAIL: This is a new appropriation. The Joint Forces HQ building was constructed in 1993 and needs a new roof, standby generators, and other improvements. The State funds will be matched with $2,000,000 in federal funds. The facility is a 248,000-square-foot building that houses the Joint Forces HQ and the State Emergency Operation Center that supports both the Iowa National Guard and the Homeland Security and Emergency Management Division. |
| Pg 3, Ln 20 |
Rebuild Iowa Infrastructure Fund appropriation to the DPD for renovation
of the Joint Forces Headquarters building.
DETAIL: This is a new appropriation. The Joint Forces HQ building was constructed in 1993 and needs a new roof, standby generators, and other improvements. The State funds will be matched with $2,000,000 in federal funds. The facility is a 248,000-square-foot building that houses the Joint Forces HQ and the State Emergency Operation Center that supports both the Iowa National Guard and the Homeland Security and Emergency Management Division. |
| Pg 3, Ln 22 |
Rebuild Iowa Infrastructure Fund appropriation to the Board of Regents
for Tuition Replacement. This appropriation notwithstands the definition
of vertical infrastructure.
DETAIL: This maintains the current level of funding compared to estimated FY 2011. The Tuition Replacement appropriation replaces the student tuition and fees that would be required to pay the debt service on academic revenue bonds authorized in prior fiscal years. In previous years, funding for this appropriation was divided between $13,975,431 from the General Fund and $10,329,981 from the RIIF. For FY 2009 through FY 2011, the entire amount of $24,305,412 was appropriated from the RIIF. Code Section 262A authorizes the sale of Academic Revenue Bonds. The Section was enacted in the 1969 Session (63rd General Assembly). The first academic revenue bonds were issued in 1970 and provided the primary source of funds for construction of academic facilities at the universities for several decades. The academic revenue bonds issued by the Board of Regents are secured by student tuition and fees and are considered to be independent and not part of State obligations. The State regularly provides an appropriation to the Board of Regents and pays most of the debt service on the academic revenue bonds through the appropriation process and has done so for many years (decades). The appropriation is not mandatory by statute, but the Board of Regents has previously indicated that without a tuition replacement appropriation, an aggregate increase of 5.0% in tuition across the universities would be required to pay the debt service. The General Assembly provides the appropriation to keep tuition costs lower for students. The tuition replacement appropriation provides most of the annual debt service, but a portion of the debt service is paid from reserve fund interest. |
| Pg 3, Ln 22 |
Rebuild Iowa Infrastructure Fund appropriation to the Board of Regents
for Tuition Replacement. This appropriation notwithstands the definition
of vertical infrastructure.
DETAIL: This maintains the current level of funding compared to estimated FY 2011. The Tuition Replacement appropriation replaces the student tuition and fees that would be required to pay the debt service on academic revenue bonds authorized in prior fiscal years. In previous years, funding for this appropriation was divided between $13,975,431 from the General Fund and $10,329,981 from the RIIF. For FY 2009 through FY 2011, the entire amount of $24,305,412 was appropriated from the RIIF. Code Section 262A authorizes the sale of Academic Revenue Bonds. The Section was enacted in the 1969 Session (63rd General Assembly). The first academic revenue bonds were issued in 1970 and provided the primary source of funds for construction of academic facilities at the universities for several decades. The academic revenue bonds issued by the Board of Regents are secured by student tuition and fees and are considered to be independent and not part of State obligations. The State regularly provides an appropriation to the Board of Regents and pays most of the debt service on the academic revenue bonds through the appropriation process and has done so for many years (decades). The appropriation is not mandatory by statute, but the Board of Regents has previously indicated that without a tuition replacement appropriation, an aggregate increase of 5.0% in tuition across the universities would be required to pay the debt service. The General Assembly provides the appropriation to keep tuition costs lower for students. The tuition replacement appropriation provides most of the annual debt service, but a portion of the debt service is paid from reserve fund interest. |
| Pg 3, Ln 22 |
Rebuild Iowa Infrastructure Fund appropriation to the Board of Regents
for Tuition Replacement. This appropriation notwithstands the definition
of vertical infrastructure.
DETAIL: This maintains the current level of funding compared to estimated FY 2011. The Tuition Replacement appropriation replaces the student tuition and fees that would be required to pay the debt service on academic revenue bonds authorized in prior fiscal years. In previous years, funding for this appropriation was divided between $13,975,431 from the General Fund and $10,329,981 from the RIIF. For FY 2009 through FY 2011, the entire amount of $24,305,412 was appropriated from the RIIF. Code Section 262A authorizes the sale of Academic Revenue Bonds. The Section was enacted in the 1969 Session (63rd General Assembly). The first academic revenue bonds were issued in 1970 and provided the primary source of funds for construction of academic facilities at the universities for several decades. The academic revenue bonds issued by the Board of Regents are secured by student tuition and fees and are considered to be independent and not part of State obligations. The State regularly provides an appropriation to the Board of Regents and pays most of the debt service on the academic revenue bonds through the appropriation process and has done so for many years (decades). The appropriation is not mandatory by statute, but the Board of Regents has previously indicated that without a tuition replacement appropriation, an aggregate increase of 5.0% in tuition across the universities would be required to pay the debt service. The General Assembly provides the appropriation to keep tuition costs lower for students. The tuition replacement appropriation provides most of the annual debt service, but a portion of the debt service is paid from reserve fund interest. |
| Pg 4, Ln 1 |
Rebuild Iowa Infrastructure Fund appropriation to the Board of Regents
for the Iowa Flood Center at the University of Iowa. This appropriation
notwithstands the definition of vertical infrastructure.
DETAIL: Maintains the current level of funding compared to estimated FY 2011. House File 822 (FY 2010 Infrastructure Appropriations Act) established the Iowa Flood Center at the SUI Hydroscience and Engineering research laboratory in the College of Engineering. The funds will be used for operations, salaries, and administrative support for the Center. The Iowa Flood Center works cooperatively with the DNR, the Department of Agriculture and Land Stewardship, the National Weather Service, the U.S. Army Corps of Engineers, and the Department of Transportation, and other agencies. The mission and role of the Flood Center is developing hydrologic models for physically based flood frequency estimation and real-time forecasting of floods, including hydraulic models of floodplain inundation mapping, establishing community-based programs to improve flood monitoring and prediction along major Iowa waterways and to support ongoing flood research, sharing resources and expertise of the Iowa flood center, and assisting in the development of a workforce in the State knowledgeable regarding flood research, prediction, and mitigation strategies. In conjunction with the DNR Floodplain Management and Dam Safety program, the Flood Center has deployed 50 bridge sensors to provide real-time data for local flood forecasting and warnings and are planning for deploying additional sensors. In addition, the Flood Center and the DNR program share resources and efforts with LiDAR technology to maximize the impact of federal funding provided to the State for floodplain mapping. In the 2010 Session, the General Assembly directed $10,000,000 from the $15,000,000 federal Community Development Block Grant that was designated for floodplain mapping to the Iowa Flood Center to use for development of new floodplain maps by June 30, 2014. The Flood Center is putting the maps into an online library for the public to access. As of March 2011, online floodplain maps are available for Cedar Rapids, Charles City, Des Moines, Hills, Iowa City, and Waterloo. |
| Pg 4, Ln 1 |
Rebuild Iowa Infrastructure Fund appropriation to the Board of Regents
for the Iowa Flood Center at the University of Iowa. This appropriation
notwithstands the definition of vertical infrastructure.
DETAIL: Maintains the current level of funding compared to estimated FY 2011. House File 822 (FY 2010 Infrastructure Appropriations Act) established the Iowa Flood Center at the SUI Hydroscience and Engineering research laboratory in the College of Engineering. The funds will be used for operations, salaries, and administrative support for the Center. The Iowa Flood Center works cooperatively with the DNR, the Department of Agriculture and Land Stewardship, the National Weather Service, the U.S. Army Corps of Engineers, and the Department of Transportation, and other agencies. The mission and role of the Flood Center is developing hydrologic models for physically based flood frequency estimation and real-time forecasting of floods, including hydraulic models of floodplain inundation mapping, establishing community-based programs to improve flood monitoring and prediction along major Iowa waterways and to support ongoing flood research, sharing resources and expertise of the Iowa flood center, and assisting in the development of a workforce in the State knowledgeable regarding flood research, prediction, and mitigation strategies. In conjunction with the DNR Floodplain Management and Dam Safety program, the Flood Center has deployed 50 bridge sensors to provide real-time data for local flood forecasting and warnings and are planning for deploying additional sensors. In addition, the Flood Center and the DNR program share resources and efforts with LiDAR technology to maximize the impact of federal funding provided to the State for floodplain mapping. In the 2010 Session, the General Assembly directed $10,000,000 from the $15,000,000 federal Community Development Block Grant that was designated for floodplain mapping to the Iowa Flood Center to use for development of new floodplain maps by June 30, 2014. The Flood Center is putting the maps into an online library for the public to access. As of March 2011, online floodplain maps are available for Cedar Rapids, Charles City, Des Moines, Hills, Iowa City, and Waterloo. |
| Pg 4, Ln 4 |
Rebuild Iowa Infrastructure Fund appropriation to the Board of Regents
for major maintenance and other fire and safety projects at Regents
institutions.
DETAIL: Funds will be used for various major maintenance projects at the institutions. The Regents last received major maintenance funding of $1,000,000 in FY 2008 and a total of $16,200,000 in FY 2007. According to the Facilities Governance Report provided to the Board in February 2011, there is an estimated $528,400,000 in deferred maintenance at Regents facilities. The Regents institutions have a total of 4,446 on-campus acres and 616 off-campus acres, excluding farm acreage. Major funding sources for fire safety and deferred maintenance projects beyond the specific infrastructure appropriations have included General Fund operating budgets, Utility Renewal and Replacement funds, proceeds from Academic Revenue Bonds, income from Treasurer's Temporary Investments, and University of Iowa Hospitals Usage Funds. The Regents Five-Year Capital Plan approved at the September 2010 meeting included a request for $205,000,000 over five fiscal years to correct fire and safety deficiencies and deferred maintenance at the institutions. |
| Pg 4, Ln 4 |
Rebuild Iowa Infrastructure Fund appropriation to the Board of Regents
for major maintenance and other fire and safety projects at Regents
institutions.
DETAIL: Funds will be used for various major maintenance projects at the institutions. The Regents last received major maintenance funding of $1,000,000 in FY 2008 and a total of $16,200,000 in FY 2007. According to the Facilities Governance Report provided to the Board in February 2011, there is an estimated $528,400,000 in deferred maintenance at Regents facilities. The Regents institutions have a total of 4,446 on-campus acres and 616 off-campus acres, excluding farm acreage. Major funding sources for fire safety and deferred maintenance projects beyond the specific infrastructure appropriations have included General Fund operating budgets, Utility Renewal and Replacement funds, proceeds from Academic Revenue Bonds, income from Treasurer's Temporary Investments, and University of Iowa Hospitals Usage Funds. The Regents Five-Year Capital Plan approved at the September 2010 meeting included a request for $205,000,000 over five fiscal years to correct fire and safety deficiencies and deferred maintenance at the institutions. |
| Pg 4, Ln 10 |
Rebuild Iowa Infrastructure Fund appropriations to the Board of Regents
for the Agricultural and Biosystems Engineering Complex at Iowa State
University.
DETAIL: The appropriations total $60,400,000 over four fiscal years. The funds will be used for Phase II of the Ag/Biosystems Engineering Complex. Phase I was the Biorenewables Research Laboratory (BRL). The General Assembly appropriated a total of $32,000,000 over several fiscal years for the building. The BRL was dedicated and opened in fall 2010 and is used to develop new technologies to produce biorenewable chemicals and fuels. ConocoPhillips and the National Science Foundation have provided grants for research the BRL is undertaking. The funding in this Bill will provide for Phase II to complete the Agricultural and Biosystems Complex. Funds will provide for construction and renovation of two wings that will house modern classrooms and laboratories, and faculty and staff offices. The building will be the new home of the Department of Agricultural and Biosystems Engineering. The current location for the Department is 80 years old. |
| Pg 4, Ln 10 |
Rebuild Iowa Infrastructure Fund appropriations to the Board of Regents
for the Agricultural and Biosystems Engineering Complex at Iowa State
University.
DETAIL: The appropriations total $60,400,000 over four fiscal years. The funds will be used for Phase II of the Ag/Biosystems Engineering Complex. Phase I was the Biorenewables Research Laboratory (BRL). The General Assembly appropriated a total of $32,000,000 over several fiscal years for the building. The BRL was dedicated and opened in fall 2010 and is used to develop new technologies to produce biorenewable chemicals and fuels. ConocoPhillips and the National Science Foundation have provided grants for research the BRL is undertaking. The funding in this Bill will provide for Phase II to complete the Agricultural and Biosystems Complex. Funds will provide for construction and renovation of two wings that will house modern classrooms and laboratories, and faculty and staff offices. The building will be the new home of the Department of Agricultural and Biosystems Engineering. The current location for the Department is 80 years old. |
| Pg 4, Ln 10 |
Rebuild Iowa Infrastructure Fund appropriations to the Board of Regents
for the Agricultural and Biosystems Engineering Complex at Iowa State
University.
DETAIL: The appropriations total $60,400,000 over four fiscal years. The funds will be used for Phase II of the Ag/Biosystems Engineering Complex. Phase I was the Biorenewables Research Laboratory (BRL). The General Assembly appropriated a total of $32,000,000 over several fiscal years for the building. The BRL was dedicated and opened in fall 2010 and is used to develop new technologies to produce biorenewable chemicals and fuels. ConocoPhillips and the National Science Foundation have provided grants for research the BRL is undertaking. The funding in this Bill will provide for Phase II to complete the Agricultural and Biosystems Complex. Funds will provide for construction and renovation of two wings that will house modern classrooms and laboratories, and faculty and staff offices. The building will be the new home of the Department of Agricultural and Biosystems Engineering. The current location for the Department is 80 years old. |
| Pg 4, Ln 10 |
Rebuild Iowa Infrastructure Fund appropriations to the Board of Regents
for the Agricultural and Biosystems Engineering Complex at Iowa State
University.
DETAIL: The appropriations total $60,400,000 over four fiscal years. The funds will be used for Phase II of the Ag/Biosystems Engineering Complex. Phase I was the Biorenewables Research Laboratory (BRL). The General Assembly appropriated a total of $32,000,000 over several fiscal years for the building. The BRL was dedicated and opened in fall 2010 and is used to develop new technologies to produce biorenewable chemicals and fuels. ConocoPhillips and the National Science Foundation have provided grants for research the BRL is undertaking. The funding in this Bill will provide for Phase II to complete the Agricultural and Biosystems Complex. Funds will provide for construction and renovation of two wings that will house modern classrooms and laboratories, and faculty and staff offices. The building will be the new home of the Department of Agricultural and Biosystems Engineering. The current location for the Department is 80 years old. |
| Pg 4, Ln 10 |
Rebuild Iowa Infrastructure Fund appropriations to the Board of Regents
for the Agricultural and Biosystems Engineering Complex at Iowa State
University.
DETAIL: The appropriations total $60,400,000 over four fiscal years. The funds will be used for Phase II of the Ag/Biosystems Engineering Complex. Phase I was the Biorenewables Research Laboratory (BRL). The General Assembly appropriated a total of $32,000,000 over several fiscal years for the building. The BRL was dedicated and opened in fall 2010 and is used to develop new technologies to produce biorenewable chemicals and fuels. ConocoPhillips and the National Science Foundation have provided grants for research the BRL is undertaking. The funding in this Bill will provide for Phase II to complete the Agricultural and Biosystems Complex. Funds will provide for construction and renovation of two wings that will house modern classrooms and laboratories, and faculty and staff offices. The building will be the new home of the Department of Agricultural and Biosystems Engineering. The current location for the Department is 80 years old. |
| Pg 4, Ln 19 |
Rebuild Iowa Infrastructure Fund appropriations to the Board of Regents
for the Dental Science Building at the University of Iowa.
DETAIL: The appropriations total $29,000,000 over four fiscal years. Funds will be used for renovation and improvements to the Dental Science Building at the University of Iowa. The existing building was dedicated in 1973. The project will include renovation and modernization of clinical spaces, research areas, and development of a multidisciplinary clinical area, including constructing a new 33,000-square-foot clinic addition to the South Wing. The new addition is scheduled for occupancy in October 2011. In the process of renovating, the clinics will be made ADA-compliant as well. |
| Pg 4, Ln 19 |
Rebuild Iowa Infrastructure Fund appropriations to the Board of Regents
for the Dental Science Building at the University of Iowa.
DETAIL: The appropriations total $29,000,000 over four fiscal years. Funds will be used for renovation and improvements to the Dental Science Building at the University of Iowa. The existing building was dedicated in 1973. The project will include renovation and modernization of clinical spaces, research areas, and development of a multidisciplinary clinical area, including constructing a new 33,000-square-foot clinic addition to the South Wing. The new addition is scheduled for occupancy in October 2011. In the process of renovating, the clinics will be made ADA-compliant as well. |
| Pg 4, Ln 19 |
Rebuild Iowa Infrastructure Fund appropriations to the Board of Regents
for the Dental Science Building at the University of Iowa.
DETAIL: The appropriations total $29,000,000 over four fiscal years. Funds will be used for renovation and improvements to the Dental Science Building at the University of Iowa. The existing building was dedicated in 1973. The project will include renovation and modernization of clinical spaces, research areas, and development of a multidisciplinary clinical area, including constructing a new 33,000-square-foot clinic addition to the South Wing. The new addition is scheduled for occupancy in October 2011. In the process of renovating, the clinics will be made ADA-compliant as well. |
| Pg 4, Ln 19 |
Rebuild Iowa Infrastructure Fund appropriations to the Board of Regents
for the Dental Science Building at the University of Iowa.
DETAIL: The appropriations total $29,000,000 over four fiscal years. Funds will be used for renovation and improvements to the Dental Science Building at the University of Iowa. The existing building was dedicated in 1973. The project will include renovation and modernization of clinical spaces, research areas, and development of a multidisciplinary clinical area, including constructing a new 33,000-square-foot clinic addition to the South Wing. The new addition is scheduled for occupancy in October 2011. In the process of renovating, the clinics will be made ADA-compliant as well. |
| Pg 4, Ln 19 |
Rebuild Iowa Infrastructure Fund appropriations to the Board of Regents
for the Dental Science Building at the University of Iowa.
DETAIL: The appropriations total $29,000,000 over four fiscal years. Funds will be used for renovation and improvements to the Dental Science Building at the University of Iowa. The existing building was dedicated in 1973. The project will include renovation and modernization of clinical spaces, research areas, and development of a multidisciplinary clinical area, including constructing a new 33,000-square-foot clinic addition to the South Wing. The new addition is scheduled for occupancy in October 2011. In the process of renovating, the clinics will be made ADA-compliant as well. |
| Pg 4, Ln 21 |
Rebuild Iowa Infrastructure Fund appropriations to the Board of Regents
for renovation of Bartlett Hall and demolition of Baker Hall at the
University of Northern Iowa.
DETAIL: The appropriations total $21,000,000 over three fiscal years. Funds will be used to renovate Bartlett Hall that was built in 1917 and has been used as a residence facility. The renovation project will convert Bartlett Hall to faculty offices, seminar rooms, and laboratories. In addition, the funds will be used to demolish Baker Hall. Baker Hall was first built in 1936 and is used for office and instruction space. Baker Hall has several deficiencies that would require deferred maintenance funding, including accessibility issues, health and environment issues relating to working conditions, and energy-related issues with an old inefficient energy system. The other residence facilities will be able to handle the occupancy load currently in Bartlett Hall. |
| Pg 4, Ln 21 |
Rebuild Iowa Infrastructure Fund appropriations to the Board of Regents
for renovation of Bartlett Hall and demolition of Baker Hall at the
University of Northern Iowa.
DETAIL: The appropriations total $21,000,000 over three fiscal years. Funds will be used to renovate Bartlett Hall that was built in 1917 and has been used as a residence facility. The renovation project will convert Bartlett Hall to faculty offices, seminar rooms, and laboratories. In addition, the funds will be used to demolish Baker Hall. Baker Hall was first built in 1936 and is used for office and instruction space. Baker Hall has several deficiencies that would require deferred maintenance funding, including accessibility issues, health and environment issues relating to working conditions, and energy-related issues with an old inefficient energy system. The other residence facilities will be able to handle the occupancy load currently in Bartlett Hall. |
| Pg 4, Ln 21 |
Rebuild Iowa Infrastructure Fund appropriations to the Board of Regents
for renovation of Bartlett Hall and demolition of Baker Hall at the
University of Northern Iowa.
DETAIL: The appropriations total $21,000,000 over three fiscal years. Funds will be used to renovate Bartlett Hall that was built in 1917 and has been used as a residence facility. The renovation project will convert Bartlett Hall to faculty offices, seminar rooms, and laboratories. In addition, the funds will be used to demolish Baker Hall. Baker Hall was first built in 1936 and is used for office and instruction space. Baker Hall has several deficiencies that would require deferred maintenance funding, including accessibility issues, health and environment issues relating to working conditions, and energy-related issues with an old inefficient energy system. The other residence facilities will be able to handle the occupancy load currently in Bartlett Hall. |
| Pg 4, Ln 21 |
Rebuild Iowa Infrastructure Fund appropriations to the Board of Regents
for renovation of Bartlett Hall and demolition of Baker Hall at the
University of Northern Iowa.
DETAIL: The appropriations total $21,000,000 over three fiscal years. Funds will be used to renovate Bartlett Hall that was built in 1917 and has been used as a residence facility. The renovation project will convert Bartlett Hall to faculty offices, seminar rooms, and laboratories. In addition, the funds will be used to demolish Baker Hall. Baker Hall was first built in 1936 and is used for office and instruction space. Baker Hall has several deficiencies that would require deferred maintenance funding, including accessibility issues, health and environment issues relating to working conditions, and energy-related issues with an old inefficient energy system. The other residence facilities will be able to handle the occupancy load currently in Bartlett Hall. |
| Pg 4, Ln 29 |
Rebuild Iowa Infrastructure Fund appropriation to the DOT for the State
Recreational Trails Program.
DETAIL: Funding has varied over the years. The State Recreational Trails Program did not receive funding in FY 2011. In FY 2010, the Program received $3,500,000, but a total of $1,250,000 of that amount was earmarked for specific trails. In FY 2009, the Program received $3,000,000, but a total of $1,180,000 was designated to specific trails. In FY 2008, the Program received $2,000,000 with $415,000 designated to specific trails. When there are allocations for certain trails specified in Session Law the grants do not go through the typical application and approval process by the Transportation Commission. Funds for the Program are used for grants for Statewide recreational trails. The trail system is approximately 1,455 miles, including multiuse trails and off-road paths. A local match of 25.00% is required in accordance with the Department administrative rules. Trails that receive funding must be maintained for public use for a minimum of 20 years. Applications for funding from the trails program are considered twice per year and are approved by the Transportation Commission. In addition to the specified trails of Principal Riverwalk and Pinicon Ridge Trail Bridge from the FY 2010 funds, the grants included funds for trails in Allamakee, Black Hawk, Dickinson, Warren, and Dallas Counties and cities including Decorah, Sioux City, Iowa City, and Des Moines. |
| Pg 4, Ln 29 |
Rebuild Iowa Infrastructure Fund appropriation to the DOT for the State
Recreational Trails Program.
DETAIL: Funding has varied over the years. The State Recreational Trails Program did not receive funding in FY 2011. In FY 2010, the Program received $3,500,000, but a total of $1,250,000 of that amount was earmarked for specific trails. In FY 2009, the Program received $3,000,000, but a total of $1,180,000 was designated to specific trails. In FY 2008, the Program received $2,000,000 with $415,000 designated to specific trails. When there are allocations for certain trails specified in Session Law the grants do not go through the typical application and approval process by the Transportation Commission. Funds for the Program are used for grants for Statewide recreational trails. The trail system is approximately 1,455 miles, including multiuse trails and off-road paths. A local match of 25.00% is required in accordance with the Department administrative rules. Trails that receive funding must be maintained for public use for a minimum of 20 years. Applications for funding from the trails program are considered twice per year and are approved by the Transportation Commission. In addition to the specified trails of Principal Riverwalk and Pinicon Ridge Trail Bridge from the FY 2010 funds, the grants included funds for trails in Allamakee, Black Hawk, Dickinson, Warren, and Dallas Counties and cities including Decorah, Sioux City, Iowa City, and Des Moines. |
| Pg 4, Ln 29 |
Rebuild Iowa Infrastructure Fund appropriation to the DOT for the State
Recreational Trails Program.
DETAIL: Funding has varied over the years. The State Recreational Trails Program did not receive funding in FY 2011. In FY 2010, the Program received $3,500,000, but a total of $1,250,000 of that amount was earmarked for specific trails. In FY 2009, the Program received $3,000,000, but a total of $1,180,000 was designated to specific trails. In FY 2008, the Program received $2,000,000 with $415,000 designated to specific trails. When there are allocations for certain trails specified in Session Law the grants do not go through the typical application and approval process by the Transportation Commission. Funds for the Program are used for grants for Statewide recreational trails. The trail system is approximately 1,455 miles, including multiuse trails and off-road paths. A local match of 25.00% is required in accordance with the Department administrative rules. Trails that receive funding must be maintained for public use for a minimum of 20 years. Applications for funding from the trails program are considered twice per year and are approved by the Transportation Commission. In addition to the specified trails of Principal Riverwalk and Pinicon Ridge Trail Bridge from the FY 2010 funds, the grants included funds for trails in Allamakee, Black Hawk, Dickinson, Warren, and Dallas Counties and cities including Decorah, Sioux City, Iowa City, and Des Moines. |
| Pg 4, Ln 32 | Rebuild Iowa Infrastructure Fund appropriation to the DOT for Public
Transit Infrastructure Grants through the Public Transit Infrastructure
Grant Fund.
DETAIL: Recent funding for public transit infrastructure has been $2,000,000 from the RBC2 in FY 2011, $1,250,000 in FY 2010 from the RIIF, and $2,200,000 for FY 2009 from the RBC. The RBC funds were not available until FY 2010. Grants are provided for infrastructure-related projects at the 35 public transit agencies throughout the State. The transit agencies are eligible to apply for the grants that are approved through the Transportation Commission. The projects must meet the definition of vertical infrastructure. State match is up to 80.00%. Funds have been used for capital projects such as new bus storage buildings, administrative buildings, maintenance facilities, storage buildings, reconstruction of steam cleaning areas, vehicle storage and wash bays, as well as replacing roofs or other improvements. |
| Pg 4, Ln 32 | Rebuild Iowa Infrastructure Fund appropriation to the DOT for Public
Transit Infrastructure Grants through the Public Transit Infrastructure
Grant Fund.
DETAIL: Recent funding for public transit infrastructure has been $2,000,000 from the RBC2 in FY 2011, $1,250,000 in FY 2010 from the RIIF, and $2,200,000 for FY 2009 from the RBC. The RBC funds were not available until FY 2010. Grants are provided for infrastructure-related projects at the 35 public transit agencies throughout the State. The transit agencies are eligible to apply for the grants that are approved through the Transportation Commission. The projects must meet the definition of vertical infrastructure. State match is up to 80.00%. Funds have been used for capital projects such as new bus storage buildings, administrative buildings, maintenance facilities, storage buildings, reconstruction of steam cleaning areas, vehicle storage and wash bays, as well as replacing roofs or other improvements. |
| Pg 5, Ln 2 |
Rebuild Iowa Infrastructure Fund appropriation to the DOT for vertical
infrastructure improvements at commercial service airports.
DETAIL: Maintains the current level of funding. The DOT received $1,500,000 from the RBC2 for FY 2011. The FY 2010 appropriation of $1,500,000 came from the General Fund and was subject to the across-the-board reduction so the amount was reduced to $1,350,000. The commercial service airports infrastructure received $1,500,000 for FY 2009 from the RBC. The RBC funds were not available until FY 2010. The grant program received $1,500,000 from the RIIF in FY 2008. There are eight commercial service airports in the State. They are located in Burlington, Cedar Rapids, Des Moines, Dubuque, Fort Dodge, Mason City, Sioux City, and Waterloo. Projects planned for the FY 2011 funding include rehabilitation and renovation of hangars, construction of chemical and vehicle storage buildings, construction of an office addition, and other improvements. Typically the funds are distributed by a 50/40/10 formula, so in this case $750,000 of the funds appropriated would be allocated equally between each of the commercial service airports, $600,000 would be allocated based on the percentage of enplaned passengers during the previous fiscal year, and $150,000 would be allocated based on the proportion of air cargo tonnage at each airport during the previous fiscal year. Airports submit an application for specific projects for approval by the Transportation Commission. No local match is required. |
| Pg 5, Ln 2 |
Rebuild Iowa Infrastructure Fund appropriation to the DOT for vertical
infrastructure improvements at commercial service airports.
DETAIL: Maintains the current level of funding. The DOT received $1,500,000 from the RBC2 for FY 2011. The FY 2010 appropriation of $1,500,000 came from the General Fund and was subject to the across-the-board reduction so the amount was reduced to $1,350,000. The commercial service airports infrastructure received $1,500,000 for FY 2009 from the RBC. The RBC funds were not available until FY 2010. The grant program received $1,500,000 from the RIIF in FY 2008. There are eight commercial service airports in the State. They are located in Burlington, Cedar Rapids, Des Moines, Dubuque, Fort Dodge, Mason City, Sioux City, and Waterloo. Projects planned for the FY 2011 funding include rehabilitation and renovation of hangars, construction of chemical and vehicle storage buildings, construction of an office addition, and other improvements. Typically the funds are distributed by a 50/40/10 formula, so in this case $750,000 of the funds appropriated would be allocated equally between each of the commercial service airports, $600,000 would be allocated based on the percentage of enplaned passengers during the previous fiscal year, and $150,000 would be allocated based on the proportion of air cargo tonnage at each airport during the previous fiscal year. Airports submit an application for specific projects for approval by the Transportation Commission. No local match is required. |
| Pg 5, Ln 5 |
Rebuild Iowa Infrastructure Fund appropriation to the DOT for vertical
infrastructure improvements at general aviation airports.
DETAIL: Maintains the current level of funding compared to estimated FY 2011. General aviation vertical infrastructure projects receive State matching grants of up to 85.00% of the total project costs, with a minimum level of $5,000 in State match to be considered. Projects include landside development and renovation of airport terminals, hangars, maintenance buildings, and fuel facilities. These grants are available only to general aviation airports. There are 101 general aviation airports in the State that are publicly owned. |
| Pg 5, Ln 5 |
Rebuild Iowa Infrastructure Fund appropriation to the DOT for vertical
infrastructure improvements at general aviation airports.
DETAIL: Maintains the current level of funding compared to estimated FY 2011. General aviation vertical infrastructure projects receive State matching grants of up to 85.00% of the total project costs, with a minimum level of $5,000 in State match to be considered. Projects include landside development and renovation of airport terminals, hangars, maintenance buildings, and fuel facilities. These grants are available only to general aviation airports. There are 101 general aviation airports in the State that are publicly owned. |
| Pg 5, Ln 12 | Rebuild Iowa Infrastructure Fund to the Treasurer of State for
distribution to county fair societies that belong to the Association of
Iowa Fairs.
DETAIL: Maintains the current level of funding compared to estimated FY 2011. Funds are used for vertical infrastructure improvements at the 106 county fairs in the Association. County fairs will receive $10,000 each. |
| Pg 5, Ln 12 | Rebuild Iowa Infrastructure Fund to the Treasurer of State for
distribution to county fair societies that belong to the Association of
Iowa Fairs.
DETAIL: Maintains the current level of funding compared to estimated FY 2011. Funds are used for vertical infrastructure improvements at the 106 county fairs in the Association. County fairs will receive $10,000 each. |
| Pg 5, Ln 19 | Rebuild Iowa Infrastructure Fund appropriation to the Department of
Veterans Affairs for the Home Ownership Assistance Program for military
members. This appropriation notwithstands the definition of vertical
infrastructure.
DETAIL: Maintains the current level of funding compared to estimated FY 2011. The Program is administered by the Iowa Finance Authority (IFA) and assists military members with the purchase of a home in Iowa. The Program provides up to $5,000 for down payment and closing costs toward the purchase of a home. Service members must have served on active duty on or after September 11, 2001, and purchased a home after March 10, 2005. The home must be a primary residence and it is a once in a lifetime grant. The Department of Veterans Affairs reviews each application to determine eligibility of the service member and IFA determines eligibility for the qualifying loan. |
| Pg 5, Ln 19 | Rebuild Iowa Infrastructure Fund appropriation to the Department of
Veterans Affairs for the Home Ownership Assistance Program for military
members. This appropriation notwithstands the definition of vertical
infrastructure.
DETAIL: Maintains the current level of funding compared to estimated FY 2011. The Program is administered by the Iowa Finance Authority (IFA) and assists military members with the purchase of a home in Iowa. The Program provides up to $5,000 for down payment and closing costs toward the purchase of a home. Service members must have served on active duty on or after September 11, 2001, and purchased a home after March 10, 2005. The home must be a primary residence and it is a once in a lifetime grant. The Department of Veterans Affairs reviews each application to determine eligibility of the service member and IFA determines eligibility for the qualifying loan. |
| Pg 5, Ln 19 | Rebuild Iowa Infrastructure Fund appropriation to the Department of
Veterans Affairs for the Home Ownership Assistance Program for military
members. This appropriation notwithstands the definition of vertical
infrastructure.
DETAIL: Maintains the current level of funding compared to estimated FY 2011. The Program is administered by the Iowa Finance Authority (IFA) and assists military members with the purchase of a home in Iowa. The Program provides up to $5,000 for down payment and closing costs toward the purchase of a home. Service members must have served on active duty on or after September 11, 2001, and purchased a home after March 10, 2005. The home must be a primary residence and it is a once in a lifetime grant. The Department of Veterans Affairs reviews each application to determine eligibility of the service member and IFA determines eligibility for the qualifying loan. |
| Pg 5, Ln 20 |
Rebuild Iowa Infrastructure Fund appropriation to the Iowa Veterans Home
to upgrade generator emission controls.
DETAIL: This is a new appropriation for FY 2012. Funds will be used to upgrade the generator emission controls to meet required stack emissions for four generators. The upgrades are necessary to meet federal and State environmental requirements and must be completed by May 2013. |
| Pg 5, Ln 20 |
Rebuild Iowa Infrastructure Fund appropriation to the Iowa Veterans Home
to upgrade generator emission controls.
DETAIL: This is a new appropriation for FY 2012. Funds will be used to upgrade the generator emission controls to meet required stack emissions for four generators. The upgrades are necessary to meet federal and State environmental requirements and must be completed by May 2013. |
| Pg 5, Ln 24 | Requires nonreversion of funds appropriated from the RIIF in Division I
for four fiscal years.
DETAIL: Funds appropriated from the RIIF are available for four fiscal years. Nonreversion applies as follows to the fiscal year appropriated:
|
| Pg 6, Ln 6 |
Technology Reinvestment Fund appropriation to the DAS for technology
improvement projects for State agencies.
DETAIL: This is a decrease of $2,149,926 compared to estimated FY 2011. The funds are used for the pooled technology funding in the Return on Investment (ROI) Program. Within the ROI applications, there are six verifiable outcome measurement areas consisting of improved customer service, citizen impact, cost savings, project reengineering, source of funds, and tangible and intangible benefits. The ROI Program was established to ensure projects benefit taxpayers and minimize duplication among State agencies. Some of the funds are provided to cross-agency projects and other funding goes toward individual agency projects. Recent projects have included the LiDAR (Light Detection and Ranging) Project, Electronic Data-Filing Project, Public Health Data Warehouse, Iowa Crisis Information System (WebEOC), and Enterprise E-Mail Encryption Services. |
| Pg 6, Ln 6 |
Technology Reinvestment Fund appropriation to the DAS for technology
improvement projects for State agencies.
DETAIL: This is a decrease of $2,149,926 compared to estimated FY 2011. The funds are used for the pooled technology funding in the Return on Investment (ROI) Program. Within the ROI applications, there are six verifiable outcome measurement areas consisting of improved customer service, citizen impact, cost savings, project reengineering, source of funds, and tangible and intangible benefits. The ROI Program was established to ensure projects benefit taxpayers and minimize duplication among State agencies. Some of the funds are provided to cross-agency projects and other funding goes toward individual agency projects. Recent projects have included the LiDAR (Light Detection and Ranging) Project, Electronic Data-Filing Project, Public Health Data Warehouse, Iowa Crisis Information System (WebEOC), and Enterprise E-Mail Encryption Services. |
| Pg 6, Ln 6 |
Technology Reinvestment Fund appropriation to the DAS for technology
improvement projects for State agencies.
DETAIL: This is a decrease of $2,149,926 compared to estimated FY 2011. The funds are used for the pooled technology funding in the Return on Investment (ROI) Program. Within the ROI applications, there are six verifiable outcome measurement areas consisting of improved customer service, citizen impact, cost savings, project reengineering, source of funds, and tangible and intangible benefits. The ROI Program was established to ensure projects benefit taxpayers and minimize duplication among State agencies. Some of the funds are provided to cross-agency projects and other funding goes toward individual agency projects. Recent projects have included the LiDAR (Light Detection and Ranging) Project, Electronic Data-Filing Project, Public Health Data Warehouse, Iowa Crisis Information System (WebEOC), and Enterprise E-Mail Encryption Services. |
| Pg 6, Ln 9 |
Technology Reinvestment Fund appropriation to the DOC for costs
associated with the Iowa Corrections Offender Network (ICON).
DETAIL: Maintains the current level of funding compared to estimated FY 2011. The funds are used for implementation and operation of the ICON System. The System is designed to streamline purchasing and procurement processes, standardize reporting of fixed assets across all institutions, facilitate issuance of smart cards to inmates to make services more efficient and cost effective, streamline collections from inmates for restitution, child support, DOC sanctions, and savings plans, and reduce paper in mailrooms and the DOC office. The ICON System continues to evolve and develop. Critical modules are implemented to benefit the DOC and the criminal justice community generally. For FY 2011, some of the development included a data exchange between the Criminal Justice Information System (CJIS) with the State sex offender registry, a CJIS statewide crime code table to be used by the entire criminal justice community, and CJIS electronic presentence investigations (PSIs). |
| Pg 6, Ln 9 |
Technology Reinvestment Fund appropriation to the DOC for costs
associated with the Iowa Corrections Offender Network (ICON).
DETAIL: Maintains the current level of funding compared to estimated FY 2011. The funds are used for implementation and operation of the ICON System. The System is designed to streamline purchasing and procurement processes, standardize reporting of fixed assets across all institutions, facilitate issuance of smart cards to inmates to make services more efficient and cost effective, streamline collections from inmates for restitution, child support, DOC sanctions, and savings plans, and reduce paper in mailrooms and the DOC office. The ICON System continues to evolve and develop. Critical modules are implemented to benefit the DOC and the criminal justice community generally. For FY 2011, some of the development included a data exchange between the Criminal Justice Information System (CJIS) with the State sex offender registry, a CJIS statewide crime code table to be used by the entire criminal justice community, and CJIS electronic presentence investigations (PSIs). |
| Pg 6, Ln 9 |
Technology Reinvestment Fund appropriation to the DOC for costs
associated with the Iowa Corrections Offender Network (ICON).
DETAIL: Maintains the current level of funding compared to estimated FY 2011. The funds are used for implementation and operation of the ICON System. The System is designed to streamline purchasing and procurement processes, standardize reporting of fixed assets across all institutions, facilitate issuance of smart cards to inmates to make services more efficient and cost effective, streamline collections from inmates for restitution, child support, DOC sanctions, and savings plans, and reduce paper in mailrooms and the DOC office. The ICON System continues to evolve and develop. Critical modules are implemented to benefit the DOC and the criminal justice community generally. For FY 2011, some of the development included a data exchange between the Criminal Justice Information System (CJIS) with the State sex offender registry, a CJIS statewide crime code table to be used by the entire criminal justice community, and CJIS electronic presentence investigations (PSIs). |
| Pg 6, Ln 16 |
Technology Reinvestment Fund appropriation to the Department of
Education to pay the costs of maintenance and leases associated with the
build-out of Part III of the ICN.
DETAIL: Maintains the current level of funding compared to estimated FY 2011. The fiber optic cable for Part III sites is leased from the private sector from the vendors that installed the cable. The Iowa Communications Network (ICN) administers 383 leased connections to 328 K-12 facilities, 45 libraries, and 10 area education agencies (AEAs). At the Department of Education's request, the ICN manages and administers the Part III leases. According to the ICN, 92.00% of the total usage of video hours by K-12 facilities, AEAs, and libraries was provided through Part III sites. These leases and maintenance are a continuation of the Part III build-out project authorized in HF 578 in 1995. The funding for the leases is for 43 vendors and maintenance expenses. |
| Pg 6, Ln 16 |
Technology Reinvestment Fund appropriation to the Department of
Education to pay the costs of maintenance and leases associated with the
build-out of Part III of the ICN.
DETAIL: Maintains the current level of funding compared to estimated FY 2011. The fiber optic cable for Part III sites is leased from the private sector from the vendors that installed the cable. The Iowa Communications Network (ICN) administers 383 leased connections to 328 K-12 facilities, 45 libraries, and 10 area education agencies (AEAs). At the Department of Education's request, the ICN manages and administers the Part III leases. According to the ICN, 92.00% of the total usage of video hours by K-12 facilities, AEAs, and libraries was provided through Part III sites. These leases and maintenance are a continuation of the Part III build-out project authorized in HF 578 in 1995. The funding for the leases is for 43 vendors and maintenance expenses. |
| Pg 6, Ln 16 |
Technology Reinvestment Fund appropriation to the Department of
Education to pay the costs of maintenance and leases associated with the
build-out of Part III of the ICN.
DETAIL: Maintains the current level of funding compared to estimated FY 2011. The fiber optic cable for Part III sites is leased from the private sector from the vendors that installed the cable. The Iowa Communications Network (ICN) administers 383 leased connections to 328 K-12 facilities, 45 libraries, and 10 area education agencies (AEAs). At the Department of Education's request, the ICN manages and administers the Part III leases. According to the ICN, 92.00% of the total usage of video hours by K-12 facilities, AEAs, and libraries was provided through Part III sites. These leases and maintenance are a continuation of the Part III build-out project authorized in HF 578 in 1995. The funding for the leases is for 43 vendors and maintenance expenses. |
| Pg 6, Ln 17 |
Technology Reinvestment Fund appropriation to the Department of
Education for development and implementation of a statewide education
data warehouse.
DETAIL: Maintains the current level of funding compared to estimated FY 2011. The funds are used to operate a statewide education data warehouse to meet various needs, including State and federal reporting requirements. The warehouse is intended to be used by teachers, parents, administrators, AEA staff, Department of Education staff, and policymakers. The purpose of this is to facilitate the flow of student transcript data between Iowa high schools and postsecondary institutions nationally as well as between postsecondary institutions and other postsecondary institutions across the country, and to facilitate flow of student records among Iowa school districts. In addition, the system provides a permanent repository for the records. The operation of the system, including ongoing licensing and fees, costs approximately $1,000,000. The Department pays for $400,000 of the costs with federal funding. Authorizes the Department of Education to use the funds from this appropriation for its e-transcript data system because both e-transcript and the data warehouse are components of a longitudinal data system that provides the ability to track students throughout their education via interconnectivity with multiple schools. |
| Pg 6, Ln 17 |
Technology Reinvestment Fund appropriation to the Department of
Education for development and implementation of a statewide education
data warehouse.
DETAIL: Maintains the current level of funding compared to estimated FY 2011. The funds are used to operate a statewide education data warehouse to meet various needs, including State and federal reporting requirements. The warehouse is intended to be used by teachers, parents, administrators, AEA staff, Department of Education staff, and policymakers. The purpose of this is to facilitate the flow of student transcript data between Iowa high schools and postsecondary institutions nationally as well as between postsecondary institutions and other postsecondary institutions across the country, and to facilitate flow of student records among Iowa school districts. In addition, the system provides a permanent repository for the records. The operation of the system, including ongoing licensing and fees, costs approximately $1,000,000. The Department pays for $400,000 of the costs with federal funding. Authorizes the Department of Education to use the funds from this appropriation for its e-transcript data system because both e-transcript and the data warehouse are components of a longitudinal data system that provides the ability to track students throughout their education via interconnectivity with multiple schools. |
| Pg 6, Ln 17 |
Technology Reinvestment Fund appropriation to the Department of
Education for development and implementation of a statewide education
data warehouse.
DETAIL: Maintains the current level of funding compared to estimated FY 2011. The funds are used to operate a statewide education data warehouse to meet various needs, including State and federal reporting requirements. The warehouse is intended to be used by teachers, parents, administrators, AEA staff, Department of Education staff, and policymakers. The purpose of this is to facilitate the flow of student transcript data between Iowa high schools and postsecondary institutions nationally as well as between postsecondary institutions and other postsecondary institutions across the country, and to facilitate flow of student records among Iowa school districts. In addition, the system provides a permanent repository for the records. The operation of the system, including ongoing licensing and fees, costs approximately $1,000,000. The Department pays for $400,000 of the costs with federal funding. Authorizes the Department of Education to use the funds from this appropriation for its e-transcript data system because both e-transcript and the data warehouse are components of a longitudinal data system that provides the ability to track students throughout their education via interconnectivity with multiple schools. |
| Pg 6, Ln 27 |
Technology Reinvestment Fund appropriation to the Department of Human
Rights for continued development and implementation of the Criminal
Justice Information System (CJIS).
DETAIL: This project last received funding in FY 2009. Total received between FY 2007 and FY 2009 was $7,366,384. The CJIS will enable and facilitate the automated exchange of criminal justice information among local, State, and federal criminal justice agencies. This initiative is to develop a seamless, real-time, and electronic information sharing system for members of the criminal justice community in Iowa. Current collaboration with other criminal justice systems includes the County Attorney ProLaw Case Management and Judicial Dialog Case Management systems, Traffic and Criminal Software (TraCs) system, ICON, Iowa Online Warrants and Articles, Iowa Court Information system, and others. Funds will be used for operations of the system, further development, information technology and network hosting, and software needed for the system. |
| Pg 6, Ln 27 |
Technology Reinvestment Fund appropriation to the Department of Human
Rights for continued development and implementation of the Criminal
Justice Information System (CJIS).
DETAIL: This project last received funding in FY 2009. Total received between FY 2007 and FY 2009 was $7,366,384. The CJIS will enable and facilitate the automated exchange of criminal justice information among local, State, and federal criminal justice agencies. This initiative is to develop a seamless, real-time, and electronic information sharing system for members of the criminal justice community in Iowa. Current collaboration with other criminal justice systems includes the County Attorney ProLaw Case Management and Judicial Dialog Case Management systems, Traffic and Criminal Software (TraCs) system, ICON, Iowa Online Warrants and Articles, Iowa Court Information system, and others. Funds will be used for operations of the system, further development, information technology and network hosting, and software needed for the system. |
| Pg 6, Ln 27 |
Technology Reinvestment Fund appropriation to the Department of Human
Rights for continued development and implementation of the Criminal
Justice Information System (CJIS).
DETAIL: This project last received funding in FY 2009. Total received between FY 2007 and FY 2009 was $7,366,384. The CJIS will enable and facilitate the automated exchange of criminal justice information among local, State, and federal criminal justice agencies. This initiative is to develop a seamless, real-time, and electronic information sharing system for members of the criminal justice community in Iowa. Current collaboration with other criminal justice systems includes the County Attorney ProLaw Case Management and Judicial Dialog Case Management systems, Traffic and Criminal Software (TraCs) system, ICON, Iowa Online Warrants and Articles, Iowa Court Information system, and others. Funds will be used for operations of the system, further development, information technology and network hosting, and software needed for the system. |
| Pg 7, Ln 2 |
Technology Reinvestment Fund appropriations to the Department of Human
Services for Medicaid technology upgrades.
DETAIL: Appropriates a total of $14,375,060 over four fiscal years for Medicaid technology upgrades. Funds will be used to upgrade the information technology (IT) system that supports Medicaid claims processing and other health plan operations through the Medicaid Management Information System (MMIS). The mainframe system for MMIS is more than 35 years old and supports over 23,000,000 claims per year, 450,000 members, and over 38,000 providers. In addition the funds will be used for IT upgrades for the HIPAA 5010/ICD-10 claims transaction and coding requirements. The ICD-10 is the International Classification of Diseases and has a new coding scheme for diagnosis. All payors and providers must implement the new coding by October 1, 2013. Lastly, the funds will be used for the comprehensive eligibility system, known as the Iowa Automated Benefits Calculation System (IABC). The mainframe for the IABC is also 35 years old. There is a federal match of 90.00% for these new system implementation costs. The total from the four fiscal year appropriations provides the State match. |
| Pg 7, Ln 2 |
Technology Reinvestment Fund appropriations to the Department of Human
Services for Medicaid technology upgrades.
DETAIL: Appropriates a total of $14,375,060 over four fiscal years for Medicaid technology upgrades. Funds will be used to upgrade the information technology (IT) system that supports Medicaid claims processing and other health plan operations through the Medicaid Management Information System (MMIS). The mainframe system for MMIS is more than 35 years old and supports over 23,000,000 claims per year, 450,000 members, and over 38,000 providers. In addition the funds will be used for IT upgrades for the HIPAA 5010/ICD-10 claims transaction and coding requirements. The ICD-10 is the International Classification of Diseases and has a new coding scheme for diagnosis. All payors and providers must implement the new coding by October 1, 2013. Lastly, the funds will be used for the comprehensive eligibility system, known as the Iowa Automated Benefits Calculation System (IABC). The mainframe for the IABC is also 35 years old. There is a federal match of 90.00% for these new system implementation costs. The total from the four fiscal year appropriations provides the State match. |
| Pg 7, Ln 2 |
Technology Reinvestment Fund appropriations to the Department of Human
Services for Medicaid technology upgrades.
DETAIL: Appropriates a total of $14,375,060 over four fiscal years for Medicaid technology upgrades. Funds will be used to upgrade the information technology (IT) system that supports Medicaid claims processing and other health plan operations through the Medicaid Management Information System (MMIS). The mainframe system for MMIS is more than 35 years old and supports over 23,000,000 claims per year, 450,000 members, and over 38,000 providers. In addition the funds will be used for IT upgrades for the HIPAA 5010/ICD-10 claims transaction and coding requirements. The ICD-10 is the International Classification of Diseases and has a new coding scheme for diagnosis. All payors and providers must implement the new coding by October 1, 2013. Lastly, the funds will be used for the comprehensive eligibility system, known as the Iowa Automated Benefits Calculation System (IABC). The mainframe for the IABC is also 35 years old. There is a federal match of 90.00% for these new system implementation costs. The total from the four fiscal year appropriations provides the State match. |
| Pg 7, Ln 2 |
Technology Reinvestment Fund appropriations to the Department of Human
Services for Medicaid technology upgrades.
DETAIL: Appropriates a total of $14,375,060 over four fiscal years for Medicaid technology upgrades. Funds will be used to upgrade the information technology (IT) system that supports Medicaid claims processing and other health plan operations through the Medicaid Management Information System (MMIS). The mainframe system for MMIS is more than 35 years old and supports over 23,000,000 claims per year, 450,000 members, and over 38,000 providers. In addition the funds will be used for IT upgrades for the HIPAA 5010/ICD-10 claims transaction and coding requirements. The ICD-10 is the International Classification of Diseases and has a new coding scheme for diagnosis. All payors and providers must implement the new coding by October 1, 2013. Lastly, the funds will be used for the comprehensive eligibility system, known as the Iowa Automated Benefits Calculation System (IABC). The mainframe for the IABC is also 35 years old. There is a federal match of 90.00% for these new system implementation costs. The total from the four fiscal year appropriations provides the State match. |
| Pg 7, Ln 2 |
Technology Reinvestment Fund appropriations to the Department of Human
Services for Medicaid technology upgrades.
DETAIL: Appropriates a total of $14,375,060 over four fiscal years for Medicaid technology upgrades. Funds will be used to upgrade the information technology (IT) system that supports Medicaid claims processing and other health plan operations through the Medicaid Management Information System (MMIS). The mainframe system for MMIS is more than 35 years old and supports over 23,000,000 claims per year, 450,000 members, and over 38,000 providers. In addition the funds will be used for IT upgrades for the HIPAA 5010/ICD-10 claims transaction and coding requirements. The ICD-10 is the International Classification of Diseases and has a new coding scheme for diagnosis. All payors and providers must implement the new coding by October 1, 2013. Lastly, the funds will be used for the comprehensive eligibility system, known as the Iowa Automated Benefits Calculation System (IABC). The mainframe for the IABC is also 35 years old. There is a federal match of 90.00% for these new system implementation costs. The total from the four fiscal year appropriations provides the State match. |
| Pg 7, Ln 2 |
Technology Reinvestment Fund appropriations to the Department of Human
Services for Medicaid technology upgrades.
DETAIL: Appropriates a total of $14,375,060 over four fiscal years for Medicaid technology upgrades. Funds will be used to upgrade the information technology (IT) system that supports Medicaid claims processing and other health plan operations through the Medicaid Management Information System (MMIS). The mainframe system for MMIS is more than 35 years old and supports over 23,000,000 claims per year, 450,000 members, and over 38,000 providers. In addition the funds will be used for IT upgrades for the HIPAA 5010/ICD-10 claims transaction and coding requirements. The ICD-10 is the International Classification of Diseases and has a new coding scheme for diagnosis. All payors and providers must implement the new coding by October 1, 2013. Lastly, the funds will be used for the comprehensive eligibility system, known as the Iowa Automated Benefits Calculation System (IABC). The mainframe for the IABC is also 35 years old. There is a federal match of 90.00% for these new system implementation costs. The total from the four fiscal year appropriations provides the State match. |
| Pg 7, Ln 8 |
Technology Reinvestment Fund appropriation to the Iowa Telecommunication
and Technology Commission for the replacement of equipment for the ICN.
DETAIL: This is an increase of $3,697 compared to estimated FY 2011. The funds will be used to replace aging ICN equipment to ensure connectivity, including replacement of network equipment, routers, switches, and phones. This appropriation is also used as a required match for the State to continue to receive a Universal Service Fund rate discount that is passed on to school districts and libraries. Permits the Commission to continue to enter into contracts for the replacement of equipment and for operations and maintenance of the ICN. Authorizes the Commission to replace equipment for the backbone of the ICN through financing with the Treasurer of State. Specifies the Treasurer of State for purposes of these costs is not subject to the maximum principal limitation of $1,000,000 in accordance with Code Section 12.28(6). Requires repayment to be made from receipts associated with fees charged to use the ICN. |
| Pg 7, Ln 8 |
Technology Reinvestment Fund appropriation to the Iowa Telecommunication
and Technology Commission for the replacement of equipment for the ICN.
DETAIL: This is an increase of $3,697 compared to estimated FY 2011. The funds will be used to replace aging ICN equipment to ensure connectivity, including replacement of network equipment, routers, switches, and phones. This appropriation is also used as a required match for the State to continue to receive a Universal Service Fund rate discount that is passed on to school districts and libraries. Permits the Commission to continue to enter into contracts for the replacement of equipment and for operations and maintenance of the ICN. Authorizes the Commission to replace equipment for the backbone of the ICN through financing with the Treasurer of State. Specifies the Treasurer of State for purposes of these costs is not subject to the maximum principal limitation of $1,000,000 in accordance with Code Section 12.28(6). Requires repayment to be made from receipts associated with fees charged to use the ICN. |
| Pg 7, Ln 8 |
Technology Reinvestment Fund appropriation to the Iowa Telecommunication
and Technology Commission for the replacement of equipment for the ICN.
DETAIL: This is an increase of $3,697 compared to estimated FY 2011. The funds will be used to replace aging ICN equipment to ensure connectivity, including replacement of network equipment, routers, switches, and phones. This appropriation is also used as a required match for the State to continue to receive a Universal Service Fund rate discount that is passed on to school districts and libraries. Permits the Commission to continue to enter into contracts for the replacement of equipment and for operations and maintenance of the ICN. Authorizes the Commission to replace equipment for the backbone of the ICN through financing with the Treasurer of State. Specifies the Treasurer of State for purposes of these costs is not subject to the maximum principal limitation of $1,000,000 in accordance with Code Section 12.28(6). Requires repayment to be made from receipts associated with fees charged to use the ICN. |
| Pg 7, Ln 8 |
Technology Reinvestment Fund appropriation to the Iowa Telecommunication
and Technology Commission for the replacement of equipment for the ICN.
DETAIL: This is an increase of $3,697 compared to estimated FY 2011. The funds will be used to replace aging ICN equipment to ensure connectivity, including replacement of network equipment, routers, switches, and phones. This appropriation is also used as a required match for the State to continue to receive a Universal Service Fund rate discount that is passed on to school districts and libraries. Permits the Commission to continue to enter into contracts for the replacement of equipment and for operations and maintenance of the ICN. Authorizes the Commission to replace equipment for the backbone of the ICN through financing with the Treasurer of State. Specifies the Treasurer of State for purposes of these costs is not subject to the maximum principal limitation of $1,000,000 in accordance with Code Section 12.28(6). Requires repayment to be made from receipts associated with fees charged to use the ICN. |
| Pg 7, Ln 8 |
Technology Reinvestment Fund appropriation to the Iowa Telecommunication
and Technology Commission for the replacement of equipment for the ICN.
DETAIL: This is an increase of $3,697 compared to estimated FY 2011. The funds will be used to replace aging ICN equipment to ensure connectivity, including replacement of network equipment, routers, switches, and phones. This appropriation is also used as a required match for the State to continue to receive a Universal Service Fund rate discount that is passed on to school districts and libraries. Permits the Commission to continue to enter into contracts for the replacement of equipment and for operations and maintenance of the ICN. Authorizes the Commission to replace equipment for the backbone of the ICN through financing with the Treasurer of State. Specifies the Treasurer of State for purposes of these costs is not subject to the maximum principal limitation of $1,000,000 in accordance with Code Section 12.28(6). Requires repayment to be made from receipts associated with fees charged to use the ICN. |
| Pg 7, Ln 22 |
Technology Reinvestment Fund appropriation to the Department of
Management for an online searchable budget and financial information
database.
DETAIL: House File 45, signed by the Governor on March 7, 2011, included a requirement that the Department of Management develop, and make available to the public, online searchable databases for budget and tax rate information with specified information included. The Internet site with the online databases must be available by January 1, 2013. The Department of Management must update the databases as new data and information become available, but at least annually within 60 days following the close of the fiscal year on June 30. The databases will be developed in coordination with the DAS and the Department of Revenue. The costs of the requirements are estimated to be $571,000 for the first year of development and implementation and $123,000 each year thereafter for operational-related costs. The appropriation for FY 2012 will provide the funds necessary for development and implementation. |
| Pg 7, Ln 22 |
Technology Reinvestment Fund appropriation to the Department of
Management for an online searchable budget and financial information
database.
DETAIL: House File 45, signed by the Governor on March 7, 2011, included a requirement that the Department of Management develop, and make available to the public, online searchable databases for budget and tax rate information with specified information included. The Internet site with the online databases must be available by January 1, 2013. The Department of Management must update the databases as new data and information become available, but at least annually within 60 days following the close of the fiscal year on June 30. The databases will be developed in coordination with the DAS and the Department of Revenue. The costs of the requirements are estimated to be $571,000 for the first year of development and implementation and $123,000 each year thereafter for operational-related costs. The appropriation for FY 2012 will provide the funds necessary for development and implementation. |
| Pg 7, Ln 22 |
Technology Reinvestment Fund appropriation to the Department of
Management for an online searchable budget and financial information
database.
DETAIL: House File 45, signed by the Governor on March 7, 2011, included a requirement that the Department of Management develop, and make available to the public, online searchable databases for budget and tax rate information with specified information included. The Internet site with the online databases must be available by January 1, 2013. The Department of Management must update the databases as new data and information become available, but at least annually within 60 days following the close of the fiscal year on June 30. The databases will be developed in coordination with the DAS and the Department of Revenue. The costs of the requirements are estimated to be $571,000 for the first year of development and implementation and $123,000 each year thereafter for operational-related costs. The appropriation for FY 2012 will provide the funds necessary for development and implementation. |
| Pg 7, Ln 35 | Requires nonreversion of funds appropriated from the Technology
Reinvestment Fund in Division II for four fiscal years.
DETAIL: Funds appropriated are available for four fiscal years. Nonreversion applies as follows to the fiscal year appropriated:
|
| Pg 8, Ln 10 | Division III makes one appropriation from the Revenue Bonds Capitals Fund. |
| Pg 8, Ln 13 |
Revenue Bonds Capitals Fund (RBC) appropriation to the DOC for
construction of the Mitchellville prison.
DETAIL: This appropriation is in addition to the total of $35,521,658 over three fiscal years for construction and one-time costs that is funded from the RIIF in Section 1, for a total of $39,652,610. According to the DOC, an estimated $21,899,055 of this amount will be used for one-time costs, including generators, building management security systems, cabinets, camera and recording systems, furnishings, and other supplies and equipment. The additional $17,753,555 will be used for construction, demolition, and renovation to provide four updated buildings (Building P, Building Z, Building N, and Maintenance Building/Warehouse). The buildings will provide facilities for centralized services including training rooms for educational and vocational classes, an activities center, a library, a support building for the Minimum-Live-Out Facility, and a central warehouse outside of the security perimeter. See Section 1.3(b) for additional discussion. |
| Pg 8, Ln 21 | Division IV makes miscellaneous Code changes.
|
| Pg 8, Ln 23 |
CODE: Eliminates the RIIF appropriation to the Secure an Advanced Vision
for Education (SAVE) Fund for FY 2012 through FY 2014.
DETAIL: The RIIF provides an annual appropriation of $10,000,000 to the SAVE Fund that is established in Code Section 423F.2. The SAVE Fund consists of State sales and use tax for school infrastructure and is allocated by formula under Code Section 423E.4. After the SAVE Fund distribution, any excess is provided as property tax relief through the School Aid Formula. The purpose of the SAVE appropriation from the RIIF is to provide supplemental school infrastructure funding to school districts that receive less than the State guaranteed amount per student for school infrastructure. By FY 2014, per pupil funding will be equal. The appropriation from the RIIF to the SAVE Fund has been in place since the 2003 Legislative Session and is scheduled to sunset at the end of FY 2014. For FY 2012, it is estimated that school districts in 75 counties would lose a maximum of $55.00 per pupil if the RIIF appropriation is eliminated. The Bill eliminates the remaining three fiscal years of the RIIF appropriation to the SAVE Fund. The SAVE Fund itself is not being changed by the Bill. The estimated amount of funds that will be pooled to supplement SAVE allocations for eligible school districts from one-sixth of the Statewide sales tax is approximately $36,409,181 for FY 2012. The total SAVE Fund allocation for FY 2012 is estimated at $379,128,371, without the RIIF appropriation. |
| Pg 8, Ln 34 | CODE: Reduces the $42,000,000 standing appropriation from the RIIF to the
Environment First Fund by $9,000,000 for FY 2012 and FY 2013.
DETAIL: Funding resumes at the previous level for FY 2014. Funding was reduced to $33,000,000 in FY 2011 as well. Appropriations from the Environment First Fund are made through the Agriculture and Natural Resources Appropriations Subcommittee. |
| Pg 9, Ln 12 |
CODE: Appropriates the FY 2012 Technology Reinvestment Fund (TRF)
appropriation from the RIIF rather than the standing appropriation from
the General Fund.
DETAIL: The standing appropriation from the General Fund is $17,500,000. The amount is reduced to $17,000,000 for FY 2012 and funded from the RIIF. The TRF funding is expected to resume from the General Fund in FY 2013. The TRF receives a standing appropriation from the General Fund per Code Section 8.57C, but for FY 2009 through FY 2011, the funding was shifted to the RIIF. |
| Pg 9, Ln 12 |
CODE: Appropriates the FY 2012 Technology Reinvestment Fund (TRF)
appropriation from the RIIF rather than the standing appropriation from
the General Fund.
DETAIL: The standing appropriation from the General Fund is $17,500,000. The amount is reduced to $17,000,000 for FY 2012 and funded from the RIIF. The TRF funding is expected to resume from the General Fund in FY 2013. The TRF receives a standing appropriation from the General Fund per Code Section 8.57C, but for FY 2009 through FY 2011, the funding was shifted to the RIIF. |
| Pg 9, Ln 31 |
CODE: Captures the unneeded wagering tax allocation that goes to the
School Infrastructure Fund to pay the debt service on the revenue bonds
and transfers it to the RIIF beginning in FY 2011.
DETAIL: In FY 2002, the State issued revenue bonds to fund the School Infrastructure Program. This Program was created to provide State financial assistance to local school districts for the construction and renovation of school buildings. A wagering tax allocation of $5,000,000 is provided per Code Section 8.57 that deposits in the School Infrastructure Fund in order to pay the debt service on the bonds. The debt service is $3,500,000 annually. The last bond payment is scheduled to be made by the end of FY 2021. The School Infrastructure Fund has been receiving the $5,000,000 allocation since the bonds were issued and accumulated a balance. In the 2010 Legislative Session, the General Assembly appropriated from the extra moneys in the School Infrastructure Fund for various purposes, although normally only the debt service is paid from that Fund. The change to capture the unneeded wagering tax is similar to how the wagering tax allocation for payment on the 2009 and 2010 revenue bonds is structured in that anything unneeded is transferred to the RIIF. The transfer back will provide an additional $1,500,000 of wagering taxes to the RIIF annually until the end of the bond payments, when the allocation to the School Infrastructure Fund ceases and the entire $5,000,000 would deposit into the RIIF. This Section is effective on enactment in order to allow the additional revenue to be deposited in the RIIF for FY 2011. |
| Pg 10, Ln 2 |
CODE: Eliminates the appropriation from the General Fund for the
Community Attraction and Tourism (CAT) Grant Program for FY 2012 and FY
2013.
DETAIL: The annual appropriations of $7,000,000 from the General Fund and $5,000,000 from the RIIF were scheduled through FY 2013. The remaining two fiscal years from the General Fund are eliminated, but the appropriations from the RIIF are maintained for FY 2012 and FY 2013. Projects are approved through the Vision Iowa Board and meet the definition of vertical infrastructure. Recent projects include renovation of buildings for purposes of exhibitions spaces, art centers, museums, theaters, aquatic centers, equine centers, and other community public spaces, construction of libraries and community centers, development of recreational trails, and other improvements in local communities. |
| Pg 10, Ln 4 | CODE: Eliminates the $3,000,000 standing appropriation from the RIIF to
the Housing Trust Fund for FY 2012 and FY 2013.
DETAIL: Funding would be scheduled to resume at $3,000,000 for FY 2014 from the RIIF. The FY 2011 funding from the RIIF was reduced to $1,000,000, but the Housing Trust Fund Program received $2,000,000 from the RBC for FY 2011, keeping the total at $3,000,000. The funding that goes to the State Housing Trust Fund goes through IFA to the Local Housing Trust Funds and Project-Based Housing Program in accordance with Code Section 16.181. Current law funding for the Housing Trust Fund, per SF 2342 (FY 2009 Infrastructure Appropriations Act), has the $3,000,000 standing appropriation from the RIIF and the transfer from the Real Estate Transfer Tax (RETT) under Code Section 428A.8. The funding for the Housing Trust Fund from RETT increases in percentage by 5.00% per year through FY 2015 and then holds steady at 30.00% of the RETT, but the actual dollar amount caps at $3,000,000 (despite the percentage). The transfer from RETT has not yet reached that amount:
The Bill does not change the RETT transfer. The result of the
elimination of the RIIF appropriation for FY 2012 is that the Housing
Trust Fund will receive $2,250,000 instead of $5,250,000 for FY 2012.
|
| Pg 10, Ln 12 |
CODE: Eliminates the $200,000 appropriation that goes to the Iowa
Finance Authority for administration of the I-JOBS Program.
DETAIL: Senate File 376 (Revenue Bonding and I-JOBS Program Act) enacted by the 2008 General Assembly established the I-JOBS Program and Board and provided the $200,000 annual appropriation to IFA for its administration. The appropriation is eliminated after FY 2011. The I-JOBS Board and Program are not changed by the Bill. The Board would still maintain oversight over the portion of the Revenue Bonds Capitals Fund (RBC) and Revenue Bonds Capitals II Fund (RBC2) that were appropriated in SF 376 and SF 2389 (FY 2011 Infrastructure Appropriations Act) to go through the Board for specified competitive grants and targeted allocations. Between both the RBC and RBC2, competitive grants that went through the Board totaled $148,500,000 and the targeted allocations specified in legislation that went through the Board totaled $77,400,000. |
| Pg 10, Ln 22 | Section 10, requiring transfer to the RIIF from the School Infrastructure Fund for unneeded wagering taxes, is effective on enactment. |
| Pg 10, Ln 25 | Division V makes changes to prior appropriations in Session Law. |
| Pg 10, Ln 27 |
Extends the reversion of the FY 2007 RC2 (tobacco restricted capital
fund) appropriation to the Department of Public Safety for fire training
centers in the State, except for the allocation to Des Moines Area
Community College (DMACC).
DETAIL: The appropriation to the Department of Public Safety for the fire training centers was $2,000,000, divided among five community colleges for fire training centers around the State. The reversion is extended through the end of FY 2012. This will allow the local fire entities to complete the development of their respective fire training centers. The DMACC allocation reverted because that community college pulled out of the program so that is why the extension notes an exception. The Department received funding from the RIIF in FY 2007 and FY 2008 for the fire training centers as well. |
| Pg 11, Ln 6 |
Deappropriates the $300,000 FY 2009 RIIF appropriation that went to the
City of Dubuque for a depot and platform to accommodate future Amtrak
service and related studies needed prior to construction.
DETAIL: The City is using the funds for a feasibility and environmental study and preliminary engineering for the platform as part of a larger intermodal facility. As of March 18, 2011, $54,273 has been expended from the appropriation. The study is scheduled to be completed in Spring 2011. Currently, there is no passenger rail service from Chicago to Dubuque; the former Black Hawk service ceased operating in 1981. According to a January 2010 press release from the Illinois Governor, the Illinois Department of Transportation has plans to make improvements to the corridor to provide passenger rail from Chicago through Rockford to Dubuque and is designating $60,000,000 for that effort. It is unknown whether Illinois would provide the work to complete the rail service across the river to end in Dubuque or end their project short of the river at the last stop in Illinois, but it is anticipated that the State would need to provide the funds to complete rail improvements between the Iowa border and Dubuque. The City of Dubuque has committed $3,000,000 in their Capital Improvement program for the project construction. The intermodal facility will be designated to accommodate public transit, private buses, public parking, and have the platform/station for passenger rail service. |
| Pg 11, Ln 9 |
Deappropriates the $10,000,000 RIIF appropriation to the River
Enhancement Community Attraction and Tourism (RECAT) Fund for FY 2012
and FY 2013.
DETAIL: The RECAT Program is a multi-year appropriation from the RIIF that was slated to receive $10,000,000 annually from the RIIF through the end of FY 2013. The RECAT received an FY 2009 RIIF appropriation of $10,000,000, but that amount was transferred to the Jumpstart Housing Assistance Program. The RECAT Program received $10,000,000 from the RBC for FY 2009, but the funds were not available until FY 2010. The RECAT Program received $4,000,000 from the RBC2 for FY 2011 rather than the higher amount from the RIIF. Grants from the RECAT Program go through the Vision Iowa Board and are similar to the CAT Program grants, but are designated to promote and enhance recreational opportunities and community attractions on and near rivers or lakes within cities across the State. |
| Pg 12, Ln 5 |
Deappropriates $2,697,993 from the FY 2010 appropriation to the DOT for
passenger rail.
DETAIL: For passenger rail, the DOT received $3,000,000 for FY 2010 from the RIIF, $2,000,000 for FY 2011 from the Underground Storage Tank Fund, and an out-year appropriation of $6,500,000 for FY 2012 from the RIIF. The DOT intended to use a total of $10,000,000 from these appropriations as the first half of the required State match for its portion ($86,800,000) of a federal grant of $230,000,000 from the Federal Railroad Administration (FRA) to work in coordination with Illinois to provide passenger rail service from Chicago to Iowa City, via the Quad Cities. Illinois received the other portion of the federal grant and has appropriated funds for its state match, so the rail service from Chicago to the Quad Cities is expected to proceed. Without the State’s match, it is anticipated that the FRA will rescind the State’s portion of the grant. The funds would have been used for providing the infrastructure and improvements needed to extend the rail service from Iowa City to the Quad Cities. In addition, $1,000,000 of the FY 2010 RIIF appropriation would have been used as State match to complete a feasibility study regarding passenger rail service from Omaha, NE, to Chicago, IL. Construction on the project is expected to take four years, with service beginning by the end of FY 2015. The DOT advises that it could continue to move forward with the federal funding and the portion from the FY 2010 and FY 2011 funds, even if the FY 2012 funding is not restored. The State match money would be needed in FY 2013 through FY 2015. If the FY 2012 funds are not restored, the total amount needed for the three out-years would be $16,500,000 for State match. Additional federal funding may become available because Florida rejected $2.4 billion in rail funding that will be reallocated through a competitive grant process. The deadline for application to the FRA for the additional funding is April 4, 2011. An estimated $3,000,000 will be need annually for operating and maintenance costs, once service begins. The DOT submitted a business plan to the Governor on March 21, 2011, proposing a means for sustaining operations beginning in 2016. Under the business plan, the State share of operating costs would begin in 2021 and would be between $1,000,000 and $1,500,000. The business plan notes that no General Fund or RIIF funds are proposed for these purposes. In addition, under the proposal, local entities contribute $1,500,000 for operating costs. Section 19 deappropriates the previously enacted FY 2012 appropriation from the RIIF and strikes intent language related to future funding. Section 22 deappropriates the unexpended amount from the FY 2011 Underground Storage Tank Fund appropriation and reverts that to the RIIF. |
| Pg 12, Ln 13 |
Deappropriates the FY 2012 RIIF appropriation of $6,500,000 for
passenger rail. Strikes intent language that the General Assembly would
fund up to $20,000,000 to provide the State commitment for matching
federal funds over a four-year period.
DETAIL: The appropriation of $6,500,000 for passenger rail for FY 2012 was previously enacted in the 2010 Session. Sections 18 and 22 deappropriate the unexpended FY 2010 and FY 2011 appropriations from passenger rail in addition to the FY 2012 deappropriation. See the annotation under Section 18 for more information. |
| Pg 12, Ln 27 |
Technical correction to clarify that the appropriation to the Watershed
Improvement Review Board from the RBC2 is for watershed improvement
projects.
|
| Pg 13, Ln 3 |
Technical correction to the FY 2011 appropriation to the DOC related to
costs at the Fort Madison and Mitchellville prisons. Corrects the
language to show the purpose is for construction project management and
changes the funding source to the RIIF from the FY 2009 Prison Bonding
Fund.
DETAIL: The change in funding source is due to the appropriation being inadvertently made on anticipated net proceeds for the Prison Bonds of $131,000,000, but the actual amount when issued was $130,677,500 and matched the exact amount appropriated for construction of Fort Madison. The error in the anticipated level was due to rounding during discussions about plans for the issuance. |
| Pg 13, Ln 20 |
Deappropriates the unexpended amount from the FY 2011 appropriation from
the Underground Storage Tank Fund for passenger rail. Strikes intent
language related to the State commitment for matching funds.
DETAIL: As of March 2011, approximately $1,500,000 is unexpended. The appropriation was going to be part of the $10,000,000 that the State used for initial match funding for federal funding for passenger rail service from Chicago to Iowa City. See Section 18 for a detailed discussion. The funds are directed to revert to the RIIF on enactment. |
| Pg 14, Ln 27 |
Sections 23 through 25 make technical corrections to appropriations made
in the 2010 Session from the School Infrastructure Fund by adding
notwithstanding language. The language was needed because the purpose of
the Fund is for the specified school infrastructure program and related
bonds. Appropriations are typically not made from this Fund, but as
discussed in the annotation for Section 10, the appropriations were made
due to an accumulated balance available.
|
| Pg 14, Ln 27 |
Sections 23 through 25 make technical corrections to appropriations made
in the 2010 Session from the School Infrastructure Fund by adding
notwithstanding language. The language was needed because the purpose of
the Fund is for the specified school infrastructure program and related
bonds. Appropriations are typically not made from this Fund, but as
discussed in the annotation for Section 10, the appropriations were made
due to an accumulated balance available.
|
| Pg 14, Ln 27 |
Sections 23 through 25 make technical corrections to appropriations made
in the 2010 Session from the School Infrastructure Fund by adding
notwithstanding language. The language was needed because the purpose of
the Fund is for the specified school infrastructure program and related
bonds. Appropriations are typically not made from this Fund, but as
discussed in the annotation for Section 10, the appropriations were made
due to an accumulated balance available.
|
| Pg 15, Ln 21 | Division V is effective on enactment. |