House
Study
Bill
518
-
Introduced
HOUSE
FILE
_____
BY
(PROPOSED
COMMITTEE
ON
COMMERCE
BILL
BY
CHAIRPERSON
COWNIE)
A
BILL
FOR
An
Act
modifying
notification
requirements
applicable
to
1
underground
facility
excavations
where
underground
2
facilities
are
present.
3
BE
IT
ENACTED
BY
THE
GENERAL
ASSEMBLY
OF
THE
STATE
OF
IOWA:
4
TLSB
5409HC
(3)
85
rn/nh
H.F.
_____
Section
1.
Section
480.4,
subsection
1,
paragraph
a,
Code
1
2014,
is
amended
to
read
as
follows:
2
a.
Except
as
otherwise
provided
in
this
section
,
prior
to
3
any
excavation,
an
excavator
shall
contact
the
notification
4
center
and
provide
notice
of
the
planned
excavation.
This
5
notice
must
be
given
at
least
forty-eight
hours
,
excluding
6
Saturdays,
Sundays,
and
legal
holidays,
but
not
more
than
ten
7
calendar
days
prior
to
the
commencement
of
the
excavation
,
8
excluding
Saturdays,
Sundays,
and
legal
holidays
.
Notices
9
received
after
5:00
p.m.
shall
be
processed
as
if
received
at
10
8:00
a.m.
the
next
business
day.
The
notice
shall
be
valid
11
for
twenty
calendar
days
from
the
date
the
notice
was
provided
12
to
the
notification
center.
The
notification
center
shall
13
establish
a
toll-free
telephone
number
to
allow
excavators
to
14
provide
the
notice
required
pursuant
to
this
subsection
.
15
Sec.
2.
Section
480.4,
subsection
1,
Code
2014,
is
amended
16
by
adding
the
following
new
paragraph:
17
NEW
PARAGRAPH
.
e.
At
the
time
of
giving
notice
to
the
18
notification
center
pursuant
to
this
subsection,
an
excavator
19
shall
use
white
paint,
flags,
stakes,
or
a
combination
thereof,
20
to
mark
the
proposed
area
of
excavation
unless
it
can
be
shown
21
to
be
impractical.
Electronic
means
of
white-lining
may
be
22
used
if
that
method
is
supported
by
the
notification
center.
23
The
marking
required
under
this
subsection
shall
be
done
in
a
24
manner
that
will
last
for
a
minimum
of
five
working
days
on
any
25
nonpermanent
surface,
or
a
minimum
of
ten
working
days
on
any
26
permanent
surface.
27
Sec.
3.
Section
480.4,
subsection
3,
paragraph
a,
28
subparagraph
(1),
Code
2014,
is
amended
to
read
as
follows:
29
(1)
An
operator
who
receives
notice
from
the
notification
30
center
shall
mark
the
horizontal
location
of
the
operator’s
31
underground
facility
and
the
excavator
shall
use
due
care
in
32
excavating
in
the
marked
area
to
avoid
damaging
the
underground
33
facility.
The
operator
shall
complete
such
locating
and
34
marking
,
and
shall
notify
the
notification
center
that
the
35
-1-
LSB
5409HC
(3)
85
rn/nh
1/
4
H.F.
_____
marking
is
complete
within
forty-eight
hours
after
receiving
1
the
notice,
excluding
Saturdays,
Sundays,
and
legal
holidays,
2
unless
otherwise
agreed
by
the
operator
and
the
excavator.
3
Upon
receipt
of
such
notice
from
the
operator,
the
notification
4
center
shall
notify
the
excavator
the
marking
is
complete
5
in
accordance
with
paragraph
“d”
.
The
locating
and
marking
6
of
the
underground
facilities
shall
be
completed
at
no
cost
7
to
the
excavator.
If,
in
the
opinion
of
the
operator,
the
8
planned
excavation
requires
that
the
precise
location
of
the
9
underground
facilities
be
determined,
the
excavator,
unless
10
otherwise
agreed
upon
between
the
excavator
and
the
operator,
11
shall
hand
dig
test
holes
to
determine
the
location
of
the
12
facilities
unless
the
operator
specifies
an
alternate
method.
13
Sec.
4.
Section
480.4,
subsection
3,
paragraph
a,
Code
2014,
14
is
amended
by
adding
the
following
new
subparagraph:
15
NEW
SUBPARAGRAPH
.
(3)
Unless
otherwise
agreed
by
the
16
operator
and
excavator
in
writing,
no
excavation
shall
be
17
performed
within
twenty-five
feet
of
an
underground
natural
18
gas
transmission
line
as
defined
in
49
C.F.R.
pt.
§192.3
or
19
other
underground
facility
designated
a
critical
facility
20
by
an
operator,
unless
a
representative
of
the
operator
of
21
the
underground
natural
gas
transmission
line
or
designated
22
critical
facility
is
present
at
the
planned
excavation
area.
23
Sec.
5.
Section
480.4,
subsection
3,
paragraph
b,
Code
2014,
24
is
amended
to
read
as
follows:
25
b.
An
operator
who
receives
notice
from
the
notification
26
center
and
who
determines
that
the
operator
does
not
have
27
any
underground
facility
located
within
the
proposed
area
of
28
excavation
shall
notify
the
excavator
notification
center,
and
29
the
notification
center
shall
notify
the
excavator,
concerning
30
this
determination
prior
to
the
indicated
date
of
commencement
31
of
excavation
within
forty-eight
hours
after
receiving
the
32
notice,
excluding
Saturdays,
Sundays,
and
legal
holidays
.
33
Sec.
6.
Section
480.4,
subsection
3,
Code
2014,
is
amended
34
by
adding
the
following
new
paragraph:
35
-2-
LSB
5409HC
(3)
85
rn/nh
2/
4
H.F.
_____
NEW
PARAGRAPH
.
d.
For
the
purposes
of
this
chapter,
1
notifications
provided
to
the
excavator
by
the
operator
or
2
by
the
notification
center
shall
be
provided
in
a
consistent
3
manner
to
be
established
by
the
board
by
rule.
4
EXPLANATION
5
The
inclusion
of
this
explanation
does
not
constitute
agreement
with
6
the
explanation’s
substance
by
the
members
of
the
general
assembly.
7
This
bill
modifies
notification
requirements
applicable
to
8
excavations
where
underground
facilities
are
present.
9
Currently,
an
excavator
is
required
to
provide
notice
to
10
the
notification
center
established
in
Code
chapter
480
of
a
11
planned
excavation
at
least
48
hours
prior
to
the
excavation,
12
excluding
Saturdays,
Sundays,
and
legal
holidays.
The
bill
13
adds
the
requirement
that
the
notice
not
be
provided
more
than
14
10
calendar
days
prior
to
the
commencement
of
the
excavation,
15
and
that
notices
received
after
5:00
p.m.
shall
be
processed
16
as
if
received
at
8:00
a.m.
the
next
business
day.
The
bill
17
also
provides
that
the
notice
shall
be
valid
for
20
calendar
18
days
from
the
date
it
was
provided
to
the
notification
center.
19
The
bill
provides
that
in
addition
to
providing
notice
of
a
20
proposed
excavation,
an
excavator
shall
use
white
paint,
flags,
21
stakes,
or
a
combination
thereof
to
mark
the
proposed
area
of
22
excavation
unless
it
can
be
shown
to
be
impractical,
and
that
23
electronic
means
of
white-lining
may
be
used
if
that
method
is
24
supported
by
the
notification
center.
The
marking
is
required
25
to
be
done
in
a
manner
that
will
last
for
a
minimum
of
five
26
working
days
on
any
nonpermanent
surface,
or
a
minimum
of
10
27
working
days
on
any
permanent
surface.
28
The
bill
additionally
provides
that
an
operator
who
receives
29
notice
from
the
notification
center
of
a
proposed
excavation
30
and
who
complies
with
locating
and
marking
requirements
within
31
the
currently
required
48-hour
time
frame
excluding
Saturdays,
32
Sundays,
and
legal
holidays,
must
notify
the
notification
33
center
that
the
marking
is
complete
within
that
same
time
34
frame.
Upon
receipt
of
this
notice,
the
bill
requires
the
35
-3-
LSB
5409HC
(3)
85
rn/nh
3/
4
H.F.
_____
notification
center
to
notify
the
excavator
the
marking
is
1
complete
in
accordance
with
a
new
provision
in
the
bill
stating
2
that
notifications
shall
be
provided
in
a
consistent
manner
3
established
by
the
board
of
directors
of
the
notification
4
center.
5
Further,
the
bill
provides
that
unless
otherwise
agreed
by
6
the
operator
and
excavator
in
writing,
no
excavation
shall
7
be
performed
within
25
feet
of
an
underground
natural
gas
8
transmission
line
or
other
underground
facility
designated
9
a
critical
facility
by
an
operator,
unless
a
representative
10
of
the
operator
of
the
underground
natural
gas
transmission
11
line
or
designated
critical
facility
is
present
at
the
planned
12
excavation
area.
13
Finally,
the
bill
provides
that
an
operator
who
receives
14
notice
from
the
notification
center
and
who
determines
that
the
15
operator
does
not
have
any
underground
facility
located
within
16
the
proposed
area
of
excavation
shall
notify
the
notification
17
center,
with
the
notification
center
then
notifying
the
18
excavator,
of
this
fact,
rather
than
direct
notification
by
the
19
operator
to
the
excavator
as
currently
required,
and
that
this
20
notification
shall
be
provided
to
the
excavator
within
48
hours
21
after
receiving
the
notice,
excluding
Saturdays,
Sundays,
and
22
legal
holidays.
23
-4-
LSB
5409HC
(3)
85
rn/nh
4/
4