House
Study
Bill
574
-
Introduced
HOUSE
FILE
_____
BY
(PROPOSED
COMMITTEE
ON
COMMERCE
BILL
BY
CHAIRPERSON
SODERBERG)
A
BILL
FOR
An
Act
requiring
advance
notification
to
utilities
by
the
owner
1
of
an
alternative
energy
production
facility
of
construction
2
or
installation
of
the
facility.
3
BE
IT
ENACTED
BY
THE
GENERAL
ASSEMBLY
OF
THE
STATE
OF
IOWA:
4
TLSB
5944YC
(2)
84
rn/sc
H.F.
_____
Section
1.
NEW
SECTION
.
476.6A
Alternative
energy
1
production
facilities
——
notification
requirements.
2
No
later
than
thirty
days
prior
to
commencement
of
the
3
construction
or
installation
of
an
alternative
energy
4
production
facility,
as
defined
in
section
476.42,
the
owner
5
of
the
facility
shall
provide
written
notice
to
the
electric
6
public
utility
within
whose
service
territory
the
facility
7
is
located
of
the
owner’s
intent
to
construct
or
install
the
8
facility,
the
type
of
facility
to
be
constructed
or
installed,
9
and
the
date
that
the
facility
is
anticipated
to
commence
10
operation.
11
EXPLANATION
12
This
bill
requires
the
owner
of
an
alternative
energy
13
production
facility,
as
defined
in
Code
section
476.42,
14
to
provide
written
notice
no
later
than
30
days
prior
to
15
commencement
of
the
construction
or
installation
of
the
16
facility
to
the
electric
public
utility
within
whose
service
17
territory
the
facility
is
located.
The
notice
shall
include
18
the
fact
that
the
facility
is
being
constructed
or
installed,
19
the
type
of
facility
to
be
constructed
or
installed,
and
the
20
date
that
the
facility
is
anticipated
to
commence
operation.
21
-1-
LSB
5944YC
(2)
84
rn/sc
1/
1