Senate File 2364 S-5095 Amend the amendment, S-5089, to Senate File 2364 as follows: 1 1. By striking page 1, line 4, through page 10, line 3, and 2 inserting: 3 << DIVISION I 4 PUBLIC CONSTRUCTION BIDDING DEFINITIONS 5 Section 1. Section 26.2, subsection 3, paragraph b, 6 subparagraph (5), Code 2020, is amended to read as follows: 7 (5) Construction or repair or maintenance work performed 8 for a city utility under chapter 388 when such work is 9 performed by its employees or when such work relates to 10 existing utility infrastructure or to establishing connections 11 to existing utility systems. 12 (6) Construction or repair or maintenance work performed 13 for a rural water district under chapter 357A by its employees. 14 DIVISION II 15 ALTERNATIVE PROJECT DELIVERY CONTRACTS 16 Sec. 2. NEW SECTION . 26.17 Alternative project delivery 17 contracts. 18 1. As used in this section, unless the context otherwise 19 requires: 20 a. “Alternative project delivery contract” means either a 21 design-build or construction manager-at-risk contract. 22 b. “Bridging criteria professional” means a person, 23 corporation, partnership, or other legal entity that is 24 employed by or contracted by a government entity to assist 25 the government entity in the development of project design 26 criteria, requests for proposals, and any additional services 27 requested by the government entity to represent its interests 28 in relation to a project and who meets either of the following 29 requirements: 30 (1) Is duly licensed to practice architecture within the 31 state and can demonstrate specific knowledge of the project 32 type where alternative project delivery services are being 33 sought. 34 (2) Is duly licensed as a professional engineer within the 35 -1- S5089.3982 (2) 88 ec/rn 1/ 14 #1.
state and can demonstrate specific knowledge of the project 1 type where alternative project delivery services are being 2 sought. 3 c. “Construction manager-at-risk” means a sole 4 proprietorship, partnership, corporation, or other legal entity 5 that acts as a consultant to the government entity in the 6 development and design phases and then assumes the risk for 7 the construction, rehabilitation, alteration, or repair of a 8 project at the contracted fixed or guaranteed maximum price, 9 similar to a general contractor during the construction phase. 10 A project using a construction manager-at-risk does not include 11 the construction, reconstruction, or improvement of a highway, 12 bridge, or culvert. 13 d. “Design-build” means a project delivery method subject to 14 a two or three-phase selection process for which the design and 15 construction services are furnished under one contract. 16 e. “Design-build contract” means a contract between 17 a government entity and a design-builder to furnish the 18 architecture of record, engineering of record, and related 19 services as required for a given public project, and to 20 furnish the labor, materials, and other construction services 21 for the same public project. A design-build contract may be 22 conditioned upon subsequent refinements in scope and price, and 23 may permit the government entity to make changes in the scope 24 of the project without invalidating the design-build contract. 25 f. “Design-build project” means the design, construction, 26 alteration, addition, remodeling, or improvement of any 27 buildings, infrastructure, or facilities under contract with a 28 government entity. “Design-build project” does not include a 29 project for the construction, reconstruction, or improvement of 30 a highway, bridge, or culvert. 31 g. “Design-builder” means any individual, partnership, 32 joint venture, or corporation subject to a best-value or 33 qualification-based selection that offers to provide or 34 provides design services and general contracting services 35 -2- S5089.3982 (2) 88 ec/rn 2/ 14
through a design-build contract in which services within 1 the scope of the practice of professional architecture or 2 engineering are performed respectively by a licensed architect 3 or licensed engineer and in which services within the scope of 4 general contracting are performed by a general contractor or 5 other legal entity that furnishes architecture or engineering 6 services and construction services either directly or through 7 subcontracts or joint ventures. 8 h. “Design bridging criteria package” means the 9 performance-oriented program, scope, design, and performance 10 specifications for the design-build project sufficient to 11 permit a design-builder to prepare a response to a government 12 entity’s request for proposals for a design-build project. 13 i. “Government entity” means the same as “governmental 14 entity” defined in section 26.2 including, for the purpose of 15 this section, the state board of regents. 16 j. “Proposal” means an offer by a design-builder in response 17 to a request for proposals to enter into a design-build 18 contract. 19 k. “Request for proposals” means the document by which 20 a government entity solicits proposals for a design-build 21 contract. 22 l. “Stipend” means a payment to a design-builder who did not 23 score the highest number of points at the conclusion of phase 24 three of the best-value selection process to defray the cost of 25 participating in phase two of the selection process, and for 26 the use of any intellectual properties obtained. 27 2. Notwithstanding any other law to the contrary, a 28 government entity shall be authorized to enter into an 29 alternative project delivery contract. 30 3. Construction manager-at-risk contracts. 31 a. A government entity shall publicly disclose its intent to 32 use the construction manager-at-risk method and its selection 33 criteria at least one week prior to publishing the request 34 for proposals and request for statements of qualifications. 35 -3- S5089.3982 (2) 88 ec/rn 3/ 14
The government entity shall publish its request for proposals 1 and statements of qualifications. Before or concurrently 2 with selecting a construction manager-at-risk, the government 3 entity shall select or designate an engineer or architect 4 who shall prepare the construction documents for the project 5 and who shall comply with all state laws, as applicable. If 6 the engineer or architect is not a full-time employee of the 7 government entity, the government entity shall select the 8 engineer or architect on a basis of demonstrated competence and 9 qualifications. The government entity’s engineer or architect 10 for a project may not serve, alone or in combination with 11 another, as the construction manager-at-risk. This paragraph 12 does not prohibit a government entity’s engineer or architect 13 from providing customary construction-phase services under 14 the engineer’s or architect’s original professional service 15 agreement in accordance with applicable licensing laws. 16 b. The government entity may provide or contract for, 17 independently of the construction manager-at-risk, inspection 18 services, testing of construction materials, engineering, and 19 verification of testing services necessary for acceptance of 20 the project by the government entity. 21 c. The government entity shall select the construction 22 manager-at-risk in a two-phase process. 23 (1) Phase one. The government entity shall prepare a 24 request for statements of qualifications for the first phase. 25 The request shall include general information on the project 26 site, project scope, schedule, selection criteria, the time 27 and place for receipt of statements of qualifications, and 28 other information that may assist the government entity in its 29 selection of a construction manager-at-risk. The selection 30 criteria may include the construction manager-at-risk’s 31 experience, past performance, safety record, proposed personnel 32 and methodology, and other appropriate factors that demonstrate 33 the capability of the construction manager-at-risk. The 34 government entity shall not request fees or prices in phase 35 -4- S5089.3982 (2) 88 ec/rn 4/ 14
one. 1 (2) Phase two. In phase two, the government entity 2 shall issue a request for proposals. The government entity 3 may request that no more than five nor fewer than two 4 construction managers-at-risk, selected solely on the basis 5 of qualifications, provide additional information, including 6 the construction manager-at-risk’s project proposal, proposed 7 fee, its price for fulfilling the general conditions, and its 8 distribution plan for sharing any cost savings after completion 9 of said project. Qualifications shall account for a minimum 10 of forty percent of the evaluation. Cost shall account for a 11 maximum of sixty percent of the evaluation. 12 d. For each phase, the government entity shall receive, 13 publicly open, and read aloud the names of the construction 14 managers submitting proposals or statements of qualifications, 15 respectively. Within forty-five days after the date of opening 16 the proposals or statements of qualification submissions, the 17 government entity or its representative shall evaluate and rank 18 each proposal or statement of qualifications submission in 19 relation to the criteria set forth in the applicable request. 20 e. The government entity or its representative shall 21 select the construction manager-at-risk that submits the 22 proposal that offers the best value for the government entity 23 based on the published selection criteria and on its ranking 24 evaluation. The government entity or its representative 25 shall first attempt to negotiate a contract with the selected 26 construction manager-at-risk. If the government entity or its 27 representative is unable to negotiate a satisfactory contract 28 with the selected construction manager-at-risk, the government 29 entity or its representative shall, formally and in writing, 30 end negotiations with that construction manager-at-risk and 31 proceed to negotiate with the next construction manager-at-risk 32 in the order of the selection ranking until a contract 33 is reached or negotiations with all ranked construction 34 managers-at-risk end. 35 -5- S5089.3982 (2) 88 ec/rn 5/ 14
f. The selected construction manager-at-risk shall publicly 1 advertise and receive bids or proposals from trade contractors 2 or subcontractors for the performance of all major elements of 3 the work other than the minor work that may be included in the 4 general conditions. A construction manager-at-risk submits 5 its sealed bid or sealed proposal in the same manner as all 6 other trade contractors or subcontractors. All sealed bids 7 or proposals shall be submitted at the time and location as 8 specified in the advertisement for bids or proposals and shall 9 be publicly opened and the identity of each bidder and their 10 bid amount shall be read aloud. 11 g. The construction manager-at-risk and the government 12 entity or its representative shall review all trade contractor, 13 subcontractor, or construction manager-at-risk bids or 14 proposals in a manner that does not disclose the contents of 15 the bid or proposal during the selection process to a person 16 not employed by the construction manager-at-risk, engineer, 17 architect, or government entity involved with the project. If 18 the construction manager-at-risk submitted bids or proposals, 19 the government entity shall determine if the construction 20 manager-at-risk’s bid or proposal offers the best value for the 21 government entity. After all proposals have been evaluated and 22 clarified, the award of all contracts shall be made public. 23 h. If the construction manager-at-risk reviews, evaluates, 24 and recommends to the government entity a bid or proposal from 25 a trade contractor or subcontractor but the government entity 26 requires another bid or proposal to be accepted, the government 27 entity shall compensate the construction manager-at-risk by 28 a change in price, time, or guaranteed maximum cost for any 29 additional cost and risk that the construction manager-at-risk 30 may incur because of the government entity’s requirement that 31 another bid or proposal be accepted. 32 i. If a selected trade contractor materially defaults in the 33 performance of its work or fails to execute a contract with a 34 construction manager-at-risk after being selected in accordance 35 -6- S5089.3982 (2) 88 ec/rn 6/ 14
with this subsection, the construction manager-at-risk may 1 itself, without advertising, fulfill the contract requirements 2 or select a replacement trade contractor to fulfill the 3 contract requirements. 4 4. In soliciting proposals for a design-build contract, 5 a government entity shall determine the scope and level of 6 detail required to permit design-builders to submit proposals 7 in accordance with the request for proposals given the nature 8 of the project. 9 5. a. A bridging criteria professional may be retained by 10 the government entity as the government entity’s representative 11 to advise the government entity on design-build matters. The 12 use of the bridging criteria professional shall be strictly 13 to guide and administer the government’s needs through the 14 process. The bridging criteria professional shall have 15 demonstrated sufficient previous experience in rules and 16 procedures specific to the design-build process. The bridging 17 criteria professional shall, along with the government 18 entity, be authorized to make recommendations or influence 19 the acceptance of any material, process, or procedure used 20 during the design and construction processes in accordance 21 with the criteria established for the project for the purpose 22 of evaluating compliance of the work. The bridging criteria 23 professional may be employed or contracted by the government 24 entity to act on behalf of the government entity for the sole 25 purpose of administrative procedures and may not be connected 26 in any means to the design-build team. The duration of 27 bridging criteria professional services, prior to the issuance 28 of a design-build contract, may begin when establishing 29 the government entity’s program requirements through design 30 development if the complexity of the project with the 31 governmental entity merits this level of bridging information. 32 b. The design bridging criteria package developed by the 33 bridging criteria professional, which may include preliminary 34 designs for the project, may extend to the design development 35 -7- S5089.3982 (2) 88 ec/rn 7/ 14
level of detail, including design expectations, capacity, 1 durability, standards, ingress and egress requirements, 2 international building code considerations, performance 3 requirements, the government entity’s operational expectations, 4 requirements for interior and exterior spaces, material and 5 building system quality standards, and design and construction 6 schedule timelines. Longevity of materials and system 7 performance requirements shall be identified in the design 8 bridging criteria package to identify materials and systems 9 that have the potential to exceed the length of time the 10 project is funded. The design bridging criteria package may 11 include site development requirements, description of the 12 site, surveys, soil and environmental information concerning 13 the site, provisions for utilities, storm water retention 14 and disposal, parking requirements, requirements related 15 to applicable local laws, local permitting requirements, 16 preliminary designs for the project or portions thereof, and 17 other criteria for the intended use of the project. 18 6. A government entity shall publicly disclose its intent to 19 solicit proposals for a design-build contract and its project 20 design bridging criteria package in the same manner that it 21 would post notice for the competitive bidding process in 22 section 26.3. 23 7. In soliciting proposals for a design-build contract, a 24 government entity shall establish in the request for proposals 25 a time, place, and other specific instructions for the receipt 26 of proposals. Proposals not submitted in strict accordance 27 with the instructions may be subject to rejection. Minor 28 irregularities may be waived by the government entity. 29 8. A request for proposals shall be prepared for each 30 design-build contract and shall contain, at minimum, the 31 following elements: 32 a. The procedures to be followed for submitting proposals, 33 the criteria for evaluating proposals and their relative 34 weight, and the procedure for making awards. 35 -8- S5089.3982 (2) 88 ec/rn 8/ 14
b. The proposed terms and conditions for the design-build 1 contract, if available. 2 c. The design bridging criteria package. 3 d. A description of the drawings, specifications, or other 4 information to be submitted with the proposal, with guidance 5 as to the form and level of completeness of the drawings, 6 specifications, or other information that will be acceptable. 7 e. A schedule for planned commencement and completion of the 8 design-build contract, if available. 9 f. Budget limits for the design-build contract, if any. 10 g. Requirements including any available ratings for 11 performance bonds, payment bonds, and insurance, if any. 12 h. If using a three-phase, best-value selection process, the 13 amount of the stipend that will be available. 14 i. Any other information that the government entity in 15 its discretion chooses to request including but not limited 16 to surveys, soil reports, drawings of existing structures, 17 environmental studies, photographs, references to public 18 records, or affirmative action and minority business enterprise 19 requirements consistent with state and federal law. 20 9. A government entity seeking to enter a design-build 21 contract shall solicit design-build proposals either by 22 using a three-phase, best-value process or a two-phase, 23 qualifications-based process. 24 a. When solicitations require a three-phase, best-value 25 selection process, the process shall be conducted as follows: 26 (1) Phase one. Request for statements of qualifications of 27 design-builders. 28 (a) The government entity shall review submitted statements 29 of the qualifications and assign points to each in accordance 30 with this section and as set out in the instructions of the 31 request for qualifications. 32 (b) All design-builders shall submit a statement of 33 qualifications that shall include but not be limited to: 34 (i) Demonstrated ability to perform projects comparable in 35 -9- S5089.3982 (2) 88 ec/rn 9/ 14
design, scope, and complexity. 1 (ii) References of owners for whom design-build projects, 2 construction projects, or design projects have been performed. 3 (iii) Qualifications of personnel who will manage the 4 design and construction aspects of the project. 5 (iv) The names and qualifications of the primary design 6 consultants and the primary trade contractors with whom the 7 design-builder proposes to subcontract or joint venture. The 8 design-builder may not replace an identified contractor, 9 subcontractor, design consultant, or subconsultant without the 10 written approval of the government entity. 11 (c) The government entity shall evaluate the qualifications 12 of all the design-builders who submitted statements of 13 qualifications in accordance with the instructions of the 14 request for qualifications. Qualified design-builders 15 selected by the government entity may proceed to phase two 16 of the selection process. The evaluation shall narrow the 17 number of qualified design-builders submitting statements of 18 qualifications to not fewer than two nor more than five. Under 19 no circumstances shall price or fees be a part of the request 20 for statements of qualifications criteria. Design-builders may 21 be interviewed in either phase one or phase two of the process. 22 Points assigned in phase one of the evaluation process shall 23 not carry forward to phase two or phase three of the process. 24 All qualified design-builders shall be ranked on points given 25 in phases two and three only. 26 (d) Once no fewer than two and no more than five qualified 27 design-builders have been selected, the government entity shall 28 issue its request for proposals and provide the design-builders 29 a specified amount of time in which to concurrently assemble 30 phase two and phase three proposals. 31 (2) Phase two. Solicitation of technical proposals, 32 including conceptual design for the project. 33 (a) A design-builder shall submit its design for the project 34 to the level of detail required for the proposal along with 35 -10- S5089.3982 (2) 88 ec/rn 10/ 14
such other information the government entity requests, which 1 may include a schedule, qualifications, and experience. 2 (b) The ability of the design-builder to meet the schedule 3 for completing a project as specified by the government entity 4 may be considered as an element of evaluation in phase two. 5 (c) Under no circumstances shall the design proposal 6 contain any reference to the cost of the proposal. 7 (d) The submitted designs shall be evaluated and assigned 8 points in accordance with the requirements of the request for 9 proposals. Phase two shall account for not less than forty 10 percent and no more than sixty percent of the total point score 11 as specified in the request for proposals. 12 (3) Phase three. Proposal of construction costs. 13 (a) The government entity shall invite the selected 14 design-builders to participate in phase three. The 15 design-builders shall provide a fixed cost of design and 16 construction. The proposal shall be accompanied by bid 17 security and any other items, such as statements of minority 18 participation, as required by the request for proposals. 19 (b) Cost proposals shall be submitted in accordance with 20 the instructions in the request for proposals. The government 21 entity shall reject any proposal that is not submitted within 22 the required time frame. Phase three shall account for not 23 less than forty percent and no more than sixty percent of the 24 total point score as specified in the request for proposals. 25 (c) Proposals for phase two and phase three shall be 26 submitted concurrently at the time and place specified in the 27 request for proposals, but in separate envelopes or other means 28 of submission. The phase three cost proposals shall be opened 29 and read aloud only after phase two design proposals have been 30 evaluated and assigned points, ranked in order, and posted. 31 Cost proposals shall be opened and read aloud at the time and 32 place specified in the request for proposals. At the same time 33 and place, the evaluation team shall make public its scoring 34 of phase two. Cost proposals shall be evaluated in accordance 35 -11- S5089.3982 (2) 88 ec/rn 11/ 14
with the requirements of the request for proposals. 1 (d) If the government entity determines that it is not in 2 the best interest of the government entity to proceed with the 3 project pursuant to the proposal offered by the design-builder 4 with the highest total number of points, the government entity 5 shall reject all proposals. In this event, all design-builders 6 with lower point totals in phases two and three shall receive 7 a stipend and the responsive design-builder with the highest 8 point total shall receive an amount equal to two times the 9 stipend. If the government entity decides to award the 10 project, the responsive design-builder with the highest point 11 total shall be awarded the contract. 12 (e) As an inducement to qualified design-builders, the 13 government entity shall pay a stipend, the amount of which 14 shall be established in the request for proposals, to each 15 design-builder who submitted a proposal but was not accepted. 16 Such stipend shall be no less than one-half of one percent 17 of the total project budget. Upon payment of the stipend to 18 such a design-builder, the government entity shall acquire 19 a nonexclusive right to use the design submitted by the 20 design-builder, and the design-builder shall have no further 21 liability for the use of the design by the government entity in 22 any manner. If the design-builder desires to retain all rights 23 and interests in the design proposed, the design-builder shall 24 forfeit the stipend. 25 b. When solicitations require a two-phase, 26 qualifications-based selection process, the process shall be 27 conducted as follows: 28 (1) Phase one. Request for statements of qualifications of 29 design-builders. 30 (a) The government entity must prepare a request for 31 statements of qualifications. The request shall include 32 general information on the project site, project scope, 33 schedule, selection criteria, the time and place for receipt 34 of statements of qualifications, and other information 35 -12- S5089.3982 (2) 88 ec/rn 12/ 14
that may assist the government entity in its selection of a 1 design-builder. 2 (b) The government entity shall state the selection 3 criteria in the request for statements of qualifications. The 4 selection criteria may include the design-builder’s experience, 5 past performance, safety record, proposed personnel and 6 methodology, and other appropriate factors that demonstrate the 7 capability of the design-builder. 8 (c) Selection criteria will be ranked and assigned points 9 for each category. Point assignments shall be included as a 10 part of the request for statements of qualifications. 11 (d) The government entity shall not request fees or prices 12 in phase one. Any submissions with disclosed fees or prices 13 will be disqualified and removed from consideration. 14 (2) Phase two. Negotiations. 15 (a) Negotiations shall be conducted, beginning with the 16 design-builder ranked first. If a contract satisfactory 17 and advantageous to the government entity can be negotiated 18 at a price considered fair and reasonable and pursuant to 19 contractual terms and conditions acceptable to the government 20 entity, the award shall be made to that design-builder. 21 (b) In the event that a contract cannot be negotiated 22 with the design-builder ranked first, negotiations with that 23 design-builder shall be formally terminated. The government 24 entity shall conduct negotiations with the next-highest-ranked 25 design-builder and continue this process until a contract can 26 be negotiated that meets the terms of subparagraph division (a) 27 of this subparagraph. 28 Sec. 3. Section 262.34, subsection 1, Code 2020, is amended 29 to read as follows: 30 1. a. When the estimated cost of construction, repairs, 31 or improvement of buildings or grounds under charge of the 32 state board of regents, including construction, renovation, or 33 repairs by a private party of a property to be lease-purchased 34 by the board, exceeds one hundred thousand dollars, the board 35 -13- S5089.3982 (2) 88 ec/rn 13/ 14
shall advertise for bids for the contemplated improvement or 1 construction and shall let the work to the lowest responsible 2 bidder. However, if in the judgment of the board bids received 3 are not acceptable, the board may reject all bids and proceed 4 with the construction, repair, or improvement by a method as 5 the board may determine. All plans and specifications for 6 repairs or construction, together with bids on the plans or 7 specifications, shall be filed by the board and be open for 8 public inspection. All bids submitted under this section shall 9 be accompanied by a deposit of money, a certified check, or a 10 credit union certified share draft in an amount as the board 11 may prescribe. 12 b. The state board of regents may proceed with a 13 construction, repair, or improvement by using an alternative 14 project delivery contract in accordance with the provisions of 15 section 26.17. > 16 2. Title page, by striking lines 1 through 4 and inserting 17 < An Act relating to public construction bidding. >> 18 3. By renumbering as necessary. 19 ______________________________ TODD TAYLOR ______________________________ ______________________________ -14- S5089.3982 (2) 88 ec/rn 14/ 14 #2. #3.