House Amendment 8558


PAG LIN




     1  1    Amend the amendment, H=8349, to Senate File 2386,
     1  2 as passed by the Senate, as follows:
     1  3 #1.  Page 1, by striking lines 11 through 19.
     1  4 #2.  Page 1, line 26, by inserting after the word
     1  5 <assess> the following:  <maximum>.
     1  6 #3.  Page 1, by striking line 31 and inserting the
     1  7 following:  <energy load, projected demand, customer
     1  8 base,>.
     1  9 #4.  Page 1, line 38, by inserting after the word
     1 10 <include> the following:  <efficiency improvements to
     1 11 a utility infrastructure and system and>.
     1 12 #5.  Page 1, line 42, by inserting after the word
     1 13 <used.> the following:  <In the case of a municipal
     1 14 utility, for purposes of this paragraph, other
     1 15 utilities and departments of the municipal utility
     1 16 shall be considered customers to the same extent that
     1 17 such utilities and departments would be considered
     1 18 customers if served by an electric or gas utility that
     1 19 is not a municipal utility.>
     1 20 #6.  Page 2, line 1, by inserting after the words
     1 21 <tree planting programs,> the following:  <educational
     1 22 programs,>.
     1 23 #7.  Page 2, by striking lines 8 through 17 and
     1 24 inserting the following:  <board on or before January
     1 25 1, 2010.  The report shall include the utility's
     1 26 cost=effective energy efficiency goal, and for each
     1 27 measure utilized by the utility in meeting the goal,
     1 28 the measure's description, projected costs, and the
     1 29 analysis of its cost=effectiveness.  Each utility or
     1 30 group of utilities shall evaluate cost=effectiveness
     1 31 using the cost=effectiveness tests in accordance with
     1 32 section 476.6, subsection 14.>
     1 33 #8.  By striking page 2, line 50, through page 3,
     1 34 line 4, and inserting the following:  <projected costs
     1 35 of achieving the goals, potential rate impacts, and a
     1 36 description of the programs offered and proposed by
     1 37 each utility or group of utilities, and may take into
     1 38 account differences in>.
     1 39 #9.  Page 3, by inserting after line 20 the
     1 40 following:
     1 41    <Sec.    .  RENEWABLE ENERGY GENERATION ==
     1 42 COST=EFFECTIVE POTENTIAL STUDY.  The Iowa utility
     1 43 association, in consultation with the Iowa association
     1 44 of electric cooperatives and the Iowa association of
     1 45 municipal utilities, shall conduct a technical study
     1 46 of the potential for achieving or engaging in
     1 47 renewable energy generation on a cost=effective basis
     1 48 by 2025.  The study shall be transmitted to the office
     1 49 of energy independence by December 1, 2008, to be
     1 50 submitted with the energy independence plan required
     2  1 to be submitted by the office to the governor and the
     2  2 general assembly by December 14, 2008.>
     2  3 #10.  By renumbering as necessary.
     2  4
     2  5
     2  6                               
     2  7 REICHERT of Muscatine
     2  8
     2  9
     2 10                               
     2 11 PETERSEN of Polk
     2 12 SF 2386.507 82
     2 13 rn/rj/11970

                              -1-