House Amendment 1064 PAG LIN 1 1 Amend House File 391 as follows: 1 2 #1. Page 2, line 19, by inserting after the word 1 3 <applicable.> the following: <The guidelines, rules, 1 4 and procedures shall not require participation in a 1 5 cogeneration pilot project or program by any rate= 1 6 regulated public utility providing retail electric 1 7 service to more than five hundred twenty thousand 1 8 customers in the state as of January 1, 2003, but any 1 9 such utility shall have the option to participate.> 1 10 #2. Page 3, line 10, by striking the word 1 11 <facility> and inserting the following: <facility, 1 12 alternate energy production facility, cogeneration 1 13 pilot project facility,>. 1 14 #3. Page 4, by striking lines 27 through 29 and 1 15 inserting the following: <public utility shall have 1 16 the option of proceedingwith construction or lease of 1 17 the facility in Iowa or withdrawingaccording to 1 18 either of the following: 1 19 (1) Withdrawing its application for a certificate 1 20underpursuant to chapter 476A. 1 21 (2) Proceeding with the construction or lease of 1 22 the facility or implementation of an energy sales 1 23 agreement related to a cogeneration pilot project 1 24 facility.> 1 25 #4. Page 5, line 26, by striking the words 1 26 <months, and if there is no> and inserting the 1 27 following: <months or if there is>. 1 28 5. By renumbering, relettering, redesignating, and 1 29 correcting internal references as necessary. 1 30 1 31 1 32 1 33 WISE of Lee 1 34 1 35 1 36 1 37 JENKINS of Black Hawk 1 38 HF 391.202 80 1 39 jj/sh 1 40 1 41 1 42 1 43 1 44 1 45 1 46 1 47 1 48 1 49 1 50 -1-