1. If a permit is required pursuant to this chapter or chapter 459, 459A, or 459B for storm water discharge or an air contaminant source and a facility to be permitted is representative of a class of facilities
which could be described and conditioned by a single permit, the director may issue, modify, deny, or revoke a general permit
for all of the following conditions: a. If adoption of a general permit is proposed, the terms, conditions, and limitations of the permit shall be drafted into a
notice of intended action and adopted in accordance with the provisions of chapter 17A as a rule of the department. The same process of adoption shall be used for modification of a general permit.
b. Following the effective date of a general permit, a person proposing to conduct activities covered by the general permit shall
provide a notice of intent to conduct a covered activity on a form provided by the department. A person shall also provide
public notice of intent to conduct activities covered under the general permit by publishing notice in one newspaper with
the largest circulation in the area in which the facility is located. Notice of the discontinuation of a permitted activity
other than storm water and allowable nonstorm water discharges shall be provided in the same manner.
c. If the department finds that a proposed activity is not covered by a general permit, the department shall notify the affected
person and shall provide the person with a permit application if the practice is one which could be authorized by individual
permit.
d. A person holding an existing permit is subject to the terms of the existing permit until it expires. If the person holding
an existing permit continues the activity beyond the expiration date of the existing permit, an applicable, approved general
permit shall become effective.
e. A variance or alteration of the terms and conditions of a general permit shall not be granted. If a variance or modification
of an operation authorized by a general permit is desired, the applicant shall apply for an individual permit.
f. The department shall perform on-site inspections and review monitoring data to assess the effectiveness of general permits.
If a significant adverse environmental problem exists for an individual facility or class of facilities due to regulation
under a general permit, the facility or class of facilities shall be required to obtain individual permits.
g. The department shall establish a procedure for the filing of complaints by persons believing themselves to be adversely affected
by the environmental impact of the discharge of a facility operating under a general permit under this section.